Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
852
matching recommendationsSIC | 384 | Medical Instruments And Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0385 # 07 Y:2020 | 07 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,275 | $234 | Implemented |
MI0385 # 06 Y:2020 | 06 | 2020 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $1,866 | $4,760 | Implemented |
MI0385 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,898 | $2,100 | Implemented |
MI0385 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,047 | $1,660 | Implemented |
MI0385 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,589 | $6,672 | Implemented |
SF0565 # 06 Y:2021 | 06 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,819 | $622 | Implemented |
SF0565 # 02 Y:2021 | 02 | 2021 | AIR CONDITION ONLY SPACE NECESSARY | $35,739 | $5,236 | Implemented |
NC0650 # 03 Y:2020 | 03 | 2020 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,430 | $997 | Implemented |
NC0650 # 05 Y:2020 | 05 | 2020 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $955 | $2,350 | Implemented |
NC0650 # 06 Y:2020 | 06 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,730 | $1,200 | Implemented |
NC0650 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,314 | $20,000 | Implemented |
UU0167 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,178 | $17,274 | Implemented |
UU0167 # 03 Y:2020 | 03 | 2020 | CHANGE METHOD OF DEIONIZED WATER PRODUCTION | $35,350 | $180,000 | Implemented |
UU0167 # 02 Y:2020 | 02 | 2020 | TREAT AND REUSE RINSE WATERS | $72,249 | $60,000 | Implemented |
MA0812 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,774 | $16,650 | Implemented |
MA0812 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,190 | $5,960 | Implemented |
MA0812 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,615 | $32,940 | Implemented |
MI0368 # 01 Y:2020 | 01 | 2020 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $31,298 | $16,924 | Implemented |
MI0368 # 03 Y:2020 | 03 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,339 | $39,554 | Implemented |
MI0368 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,279 | $10,827 | Implemented |
MI0368 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $3,930 | $1,355 | Implemented |
MI0368 # 06 Y:2020 | 06 | 2020 | OPTIMIZE PLANT POWER FACTOR | $2,326 | $1,672 | Implemented |
MI0368 # 07 Y:2020 | 07 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $1,717 | $3,320 | Implemented |
MI0368 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $663 | $1,980 | Implemented |
MI0368 # 09 Y:2020 | 09 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $626 | $1,661 | Implemented |