Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

318

matching recommendations
Reset
SIC 384 Medical Instruments And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0429 # 07 Y:2023 07 2023 USE SOLAR HEAT TO HEAT WATER $1,687 $8,166 Not Implemented
MI0429 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $1,608 $1,012 Not Implemented
MI0429 # 04 Y:2023 04 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $16,344 $70,840 Not Implemented
MI0429 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,166 $12,997 Implemented
MI0429 # 06 Y:2023 06 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,831 $6,950 Not Implemented
UF0593 # 07 Y:2023 07 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,604 $0 Implemented
UF0593 # 09 Y:2023 09 2023 LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA $36,476 $11,225 Implemented
UF0593 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $97,641 $400,000 Implemented
UF0593 # 08 Y:2023 08 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $121,588 $12,000 Implemented
UF0593 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,641 $136,253 Implemented
UF0593 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $62,208 $25,500 Implemented
UF0593 # 06 Y:2023 06 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $25,827 $58,363 Not Implemented
UF0593 # 01 Y:2023 01 2023 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $131,807 $215,600 Implemented
UF0593 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $110,377 $92,132 Implemented
UF0589 # 16 Y:2023 16 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $2,322 $0 Implemented
UF0589 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $920,434 $2,793,000 Implemented
UF0589 # 02 Y:2023 02 2023 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $505,092 $2,115,660 Implemented
UF0589 # 03 Y:2023 03 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $130,403 $95,736 Not Implemented
UF0589 # 07 Y:2023 07 2023 CLEAN CONDENSER TUBES $15,589 $0 Implemented
UF0589 # 11 Y:2023 11 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $4,770 $2,800 Implemented
UF0589 # 06 Y:2023 06 2023 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $18,200 $14,400 Implemented
UF0589 # 09 Y:2023 09 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,438 $0 Implemented
UF0589 # 08 Y:2023 08 2023 DIRECT WARMEST AIR TO COMBUSTION INTAKE $13,274 $30,000 Implemented
UF0589 # 15 Y:2023 15 2023 INSTALL OCCUPANCY SENSORS $2,868 $9,968 Implemented
UF0589 # 17 Y:2023 17 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $88,974 $10,000 Implemented