Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsSIC | 384 | Medical Instruments And Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0233 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,400 | $1,660 | Implemented |
MI0233 # 03 Y:2012 | 03 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $44,157 | $11,632 | Not Implemented |
MI0233 # 02 Y:2012 | 02 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $150,126 | $80 | Implemented |
MI0233 # 01 Y:2012 | 01 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $246,388 | $33,021 | Implemented |
MI0233 # 07 Y:2012 | 07 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,508 | $5,069 | Not Implemented |
MI0233 # 12 Y:2012 | 12 | 2012 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $3,056 | $843 | Implemented |
MI0233 # 05 Y:2012 | 05 | 2012 | OPTIMIZE PLANT POWER FACTOR | $10,216 | $11,120 | Not Implemented |
MI0233 # 09 Y:2012 | 09 | 2012 | INSTALL OCCUPANCY SENSORS | $5,193 | $800 | Implemented |
MI0233 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,406 | $1,060 | Not Implemented |
MI0233 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,631 | $2,050 | Implemented |
MI0233 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,430 | $2,665 | Implemented |
MI0233 # 11 Y:2012 | 11 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,084 | $80 | Implemented |
AM0617 # 04 Y:2012 | 04 | 2012 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $2,146 | $0 | Implemented |
AM0617 # 09 Y:2012 | 09 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $630 | $300 | Implemented |
AM0617 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $911 | $5,377 | Implemented |
AM0617 # 07 Y:2012 | 07 | 2012 | RECYCLE WHITE WATER | $1,161 | $7,179 | Implemented |
AM0617 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,871 | $64 | Implemented |
AM0617 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $2,056 | $1,562 | Implemented |
AM0617 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,264 | $2,775 | Implemented |
AM0617 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $153,000 | $375,000 | Not Implemented |
AM0617 # 01 Y:2012 | 01 | 2012 | DEVELOP STANDARD OPERATING PROCEDURES | $191,786 | $6,200 | Not Implemented |
LE0342 # 05 Y:2012 | 05 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $20,149 | $48,500 | Not Implemented |
LE0342 # 06 Y:2012 | 06 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,433 | $40,000 | Implemented |
LE0342 # 12 Y:2012 | 12 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $22,316 | $58,200 | Not Implemented |
LE0342 # 11 Y:2012 | 11 | 2012 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $601,021 | $1,280,000 | Not Implemented |