Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsSIC | 384 | Medical Instruments And Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0689 # 06 Y:2025 | 06 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $1,571 | $2,065 | n/a |
WV0689 # 07 Y:2025 | 07 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $962 | $4,680 | n/a |
WV0689 # 05 Y:2025 | 05 | 2025 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,146 | $4,200 | n/a |
WV0689 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,151 | $3,917 | n/a |
WV0689 # 02 Y:2025 | 02 | 2025 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $16,980 | $75,000 | n/a |
WV0689 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,908 | $28,814 | n/a |
WV0689 # 01 Y:2025 | 01 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $23,841 | $12,250 | n/a |
WV0689 # 08 Y:2025 | 08 | 2025 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $866 | $4,000 | n/a |
WV0689 # 10 Y:2025 | 10 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $576 | $700 | n/a |
WV0689 # 09 Y:2025 | 09 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $826 | $1,390 | n/a |
WV0689 # 11 Y:2025 | 11 | 2025 | INSULATE BARE EQUIPMENT | $234 | $786 | n/a |
SD0677 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $43,986 | $59,050 | n/a |
SD0677 # 08 Y:2025 | 08 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,908 | $11,010 | n/a |
SD0677 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,175 | $5,179 | n/a |
SD0677 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $22,813 | $1,191 | n/a |
SD0677 # 03 Y:2025 | 03 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $10,792 | $133,100 | n/a |
SD0677 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,718 | $0 | n/a |
SD0677 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,337 | $2,362 | n/a |
SD0677 # 04 Y:2025 | 04 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,402 | $4,350 | n/a |
MS0447 # 06 Y:2025 | 06 | 2025 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $2,030,279 | $11,484,200 | n/a |
MS0447 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $144,047 | $116,128 | n/a |
MS0447 # 04 Y:2025 | 04 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $43,724 | $145,930 | n/a |
MS0447 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $56,915 | $6,958 | n/a |
MS0447 # 02 Y:2025 | 02 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $80,000 | $30,005 | n/a |
MS0447 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $668,474 | $6,707,386 | n/a |