Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
986
matching recommendationsSIC | 3841 | Surgical And Medical Instruments |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0437 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $441 | $433 | n/a |
MI0437 # 03 Y:2023 | 03 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $92,403 | $2,400 | n/a |
MI0437 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,425 | $24,780 | n/a |
MI0437 # 01 Y:2023 | 01 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $595,572 | $1,797,720 | n/a |
MI0437 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $127,058 | $120 | n/a |
UC2316 # 09 Y:2023 | 09 | 2023 | INSTALL WIND POWERED ELECTRIC GENERATOR | $1,380,736 | $10,992,131 | n/a |
UC2316 # 03 Y:2023 | 03 | 2023 | RECOVER AND REUSE WASTE MATERIAL | $76,811 | $332,613 | n/a |
UC2316 # 04 Y:2023 | 04 | 2023 | INSTALL TURBULATORS | $13,337 | $10,920 | n/a |
UC2316 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,167 | $5,801 | n/a |
UC2316 # 05 Y:2023 | 05 | 2023 | REDUCE EXCESSIVE BOILER BLOWDOWN | $2,801 | $12,000 | n/a |
UC2316 # 06 Y:2023 | 06 | 2023 | BURN A LESS EXPENSIVE GRADE OF FUEL | $153,910 | $207,578 | n/a |
UC2316 # 10 Y:2023 | 10 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $20,195 | $268,543 | n/a |
UC2316 # 08 Y:2023 | 08 | 2023 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $22,194 | $134,412 | n/a |
UC2316 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $26,355 | $75 | n/a |
UC2316 # 07 Y:2023 | 07 | 2023 | REPLACE BOILER | $177,614 | $423,535 | n/a |
MI0429 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,166 | $12,997 | n/a |
MI0429 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $172,404 | $974,914 | n/a |
MI0429 # 06 Y:2023 | 06 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,831 | $6,950 | n/a |
MI0429 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO HEAT WATER | $1,687 | $8,166 | n/a |
MI0429 # 08 Y:2023 | 08 | 2023 | INSULATE BARE EQUIPMENT | $1,608 | $1,012 | n/a |
MI0429 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,739 | $1,660 | n/a |
MI0429 # 03 Y:2023 | 03 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $25,267 | $0 | n/a |
MI0429 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $16,344 | $70,840 | n/a |
UU0231 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,519 | $14,890 | n/a |
UU0231 # 01 Y:2023 | 01 | 2023 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $19,636 | $127,500 | n/a |