IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,032

matching recommendations
Reset
SIC 3841 Surgical And Medical Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0516 # 02 Y:2018 02 2018 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,142 $18,013 Implemented
UF0516 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,159 $12,014 Implemented
UF0516 # 04 Y:2018 04 2018 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $200,000 $100,000 Not Implemented
UF0516 # 05 Y:2018 05 2018 MOVE PRODUCT USING MECHANICAL MEANS $42,000 $70,000 Implemented
UF0516 # 06 Y:2018 06 2018 INSTALL EQUIPMENT TO MOVE PRODUCT $30,207 $5,350 Not Implemented
UF0516 # 07 Y:2018 07 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $23,725 $10,695 Not Implemented
MA0789 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,415 $29,288 Implemented
MA0789 # 02 Y:2018 02 2018 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $9,053 $960 Not Implemented
MA0789 # 03 Y:2018 03 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,660 $1,200 Not Implemented
MA0789 # 04 Y:2018 04 2018 REPLACE ELECTRIC REHEAT WITH HEAT PIPES $2,881 $6,120 Not Implemented
MA0789 # 05 Y:2018 05 2018 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,779 $960 Not Implemented
UU0128 # 01 Y:2018 01 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $109,419 $1,693 Implemented
UU0128 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $80,946 $500 Implemented
UU0128 # 03 Y:2018 03 2018 ADD AREA LIGHTING SWITCHES $1,227 $2,200 Implemented
UU0128 # 04 Y:2018 04 2018 DISCONNECT BALLASTS $958 $800 Not Implemented
UU0128 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $829 $0 Implemented
MI0324 # 01 Y:2017 01 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $94,097 $134,000 Not Implemented
MI0324 # 02 Y:2017 02 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $28,637 $15,056 Implemented
MI0324 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $28,032 $41,300 Implemented
MI0324 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,387 $8,923 Implemented
MI0324 # 05 Y:2017 05 2017 COMBINE UTILITY METERS $7,245 $100 Not Implemented
MI0324 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,467 $4,900 Implemented
MI0324 # 07 Y:2017 07 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,663 $1,478 Implemented
MI0324 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $3,528 $1,000 Implemented
MI0324 # 09 Y:2017 09 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,760 $250 Not Implemented