IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

187

matching recommendations
Reset
SIC 3841 Surgical And Medical Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0333 # 01 Y:2018 01 2018 PURCHASE EQUIPMENT INSTEAD OF LEASING $304,263 $795,000 Not Implemented
MI0333 # 02 Y:2018 02 2018 AIR CONDITION ONLY SPACE NECESSARY $17,320 $2,724 Implemented
MI0333 # 03 Y:2018 03 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,427 $320 Implemented
MI0333 # 04 Y:2018 04 2018 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $7,399 $15,000 Implemented
MI0333 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,026 $13,843 Implemented
MI0333 # 06 Y:2018 06 2018 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $4,911 $80 Implemented
MI0333 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $2,191 $2,240 Implemented
MI0333 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $328 $826 Implemented
UF0516 # 01 Y:2018 01 2018 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $120,914 $400,000 Not Implemented
UF0516 # 02 Y:2018 02 2018 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,142 $18,013 Implemented
UF0516 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,159 $12,014 Implemented
UF0516 # 04 Y:2018 04 2018 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $200,000 $100,000 Not Implemented
UF0516 # 05 Y:2018 05 2018 MOVE PRODUCT USING MECHANICAL MEANS $42,000 $70,000 Implemented
UF0516 # 06 Y:2018 06 2018 INSTALL EQUIPMENT TO MOVE PRODUCT $30,207 $5,350 Not Implemented
UF0516 # 07 Y:2018 07 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $23,725 $10,695 Not Implemented
MI0282 # 01 Y:2015 01 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $23,744 $1,120 Not Implemented
MI0282 # 02 Y:2015 02 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,822 $10,322 Implemented
MI0282 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,613 $1,660 Implemented
MI0282 # 04 Y:2015 04 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,005 $1,220 Not Implemented
MI0282 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,694 $40 Not Implemented
MI0282 # 06 Y:2015 06 2015 REDUCE HEAT GAIN BY WINDOW TINTING $3,779 $16,060 Not Implemented
MI0282 # 07 Y:2015 07 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,378 $40 Implemented
MI0282 # 08 Y:2015 08 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,655 $1,080 Implemented
MI0282 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,303 $5,120 Implemented
MI0282 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $1,250 $995 Implemented