IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 3841 Surgical And Medical Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0151 # 08 Y:1998 08 1998 USE EVAPORATION TO CONCENTRATE MATERIAL $4,721 $16,000 Not Implemented
NC0151 # 07 Y:1998 07 1998 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $11,500 $45,000 Not Implemented
NC0151 # 06 Y:1998 06 1998 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $3,822 $15,000 Not Implemented
NC0151 # 05 Y:1998 05 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,290 $3,000 Not Implemented
NC0151 # 04 Y:1998 04 1998 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $700 $2,100 Not Implemented
NC0151 # 03 Y:1998 03 1998 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $401 $1,500 Not Implemented
NC0151 # 02 Y:1998 02 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $33,411 $132,700 Not Implemented
NC0151 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,157 $600 Not Implemented
NC0142 # 02 Y:1998 02 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,239 $0 Implemented
NC0142 # 08 Y:1998 08 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $375 $200 Not Implemented
NC0142 # 07 Y:1998 07 1998 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,435 $10 Implemented
NC0142 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,279 $31,754 Implemented
NC0142 # 05 Y:1998 05 1998 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,977 $1,448 Not Implemented
NC0142 # 04 Y:1998 04 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,769 $9,000 Not Implemented
NC0142 # 03 Y:1998 03 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,688 $1,200 Implemented
NC0142 # 01 Y:1998 01 1998 INSTALL TIMERS AND/OR THERMOSTATS $2,463 $1,050 Implemented
NC0142 # 09 Y:1998 09 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $75 $0 Implemented
ND0292 # 10 Y:1998 10 1998 OPTIMIZE PLANT POWER FACTOR $4,292 $9,475 Implemented
ND0292 # 09 Y:1998 09 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $59 $350 Implemented
ND0292 # 08 Y:1998 08 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $96 $0 Implemented
ND0292 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $301 $208 Implemented
ND0292 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $911 $900 Implemented
ND0292 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,312 $950 Implemented
ND0292 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,679 $80 Implemented
ND0292 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,452 $6,303 Implemented