Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
98
matching recommendationsSIC | 3842 | Surgical Appliances And Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0241 # 07 Y:2013 | 07 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,118 | $5,397 | Not Implemented |
UF0436 # 03 Y:2010 | 03 | 2010 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $27,623 | $20,280 | Not Implemented |
UF0436 # 02 Y:2010 | 02 | 2010 | INSTALL TURBULATORS | $4,953 | $7,500 | Not Implemented |
UF0436 # 01 Y:2010 | 01 | 2010 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $493 | $388 | Implemented |
UF0436 # 04 Y:2010 | 04 | 2010 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $13,947 | $350 | Implemented |
UF0436 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,376 | $1,782 | Implemented |
UF0436 # 07 Y:2010 | 07 | 2010 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $811 | $895 | Implemented |
UF0436 # 09 Y:2010 | 09 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $29,576 | $10,400 | Not Implemented |
UF0436 # 08 Y:2010 | 08 | 2010 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $19,232 | $26,795 | Implemented |
UF0436 # 06 Y:2010 | 06 | 2010 | INSTALL OCCUPANCY SENSORS | $1,758 | $524 | Not Implemented |
UF0434 # 09 Y:2010 | 09 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,310 | $20,000 | Not Implemented |
UF0434 # 15 Y:2010 | 15 | 2010 | RECYCLE FLUORESCENT LAMPS | $571 | $3,405 | Not Implemented |
UF0434 # 14 Y:2010 | 14 | 2010 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $11,568 | $0 | Not Implemented |
UF0434 # 13 Y:2010 | 13 | 2010 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $1,875 | $10,480 | Not Implemented |
UF0434 # 12 Y:2010 | 12 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,125 | $2,284 | Not Implemented |
UF0434 # 11 Y:2010 | 11 | 2010 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,515 | $7,701 | Not Implemented |
UF0434 # 10 Y:2010 | 10 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,649 | $232 | Not Implemented |
UF0434 # 08 Y:2010 | 08 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,980 | $881 | Not Implemented |
UF0434 # 07 Y:2010 | 07 | 2010 | INSTALL OCCUPANCY SENSORS | $1,414 | $1,926 | Not Implemented |
UF0434 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,388 | $0 | Not Implemented |
UF0434 # 05 Y:2010 | 05 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $18,101 | $4,865 | Not Implemented |
UF0434 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,057 | $401 | Not Implemented |
UF0434 # 03 Y:2010 | 03 | 2010 | USE COMPRESSOR AIR FILTERS | $1,326 | $210 | Not Implemented |
UF0434 # 02 Y:2010 | 02 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,786 | $4,195 | Not Implemented |
UF0434 # 01 Y:2010 | 01 | 2010 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $3,268 | $1,893 | Not Implemented |