IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

502

matching recommendations
Reset
SIC 3842 Surgical Appliances And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0596 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $120 Implemented
AM0596 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $225 $47 Implemented
AM0588 # 01 Y:2010 01 2010 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,390 $0 Implemented
AM0588 # 02 Y:2010 02 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $19,580 $500 Implemented
AM0588 # 03 Y:2010 03 2010 PAY UTILITY BILLS ON TIME $2,160 $0 Implemented
AM0588 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,437 $670 Implemented
AM0588 # 05 Y:2010 05 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $560 $0 Implemented
UF0436 # 01 Y:2010 01 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $493 $388 Implemented
UF0436 # 02 Y:2010 02 2010 INSTALL TURBULATORS $4,953 $7,500 Not Implemented
UF0436 # 03 Y:2010 03 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $27,623 $20,280 Not Implemented
UF0436 # 04 Y:2010 04 2010 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $13,947 $350 Implemented
UF0436 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,376 $1,782 Implemented
UF0436 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $1,758 $524 Not Implemented
UF0436 # 07 Y:2010 07 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $811 $895 Implemented
UF0436 # 08 Y:2010 08 2010 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $19,232 $26,795 Implemented
UF0436 # 09 Y:2010 09 2010 DEVELOP A REPAIR/REPLACE POLICY $29,576 $10,400 Not Implemented
UF0434 # 01 Y:2010 01 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,268 $1,893 Not Implemented
UF0434 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,786 $4,195 Not Implemented
UF0434 # 03 Y:2010 03 2010 USE COMPRESSOR AIR FILTERS $1,326 $210 Not Implemented
UF0434 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,057 $401 Not Implemented
UF0434 # 05 Y:2010 05 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $18,101 $4,865 Not Implemented
UF0434 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,388 $0 Not Implemented
UF0434 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $1,414 $1,926 Not Implemented
UF0434 # 08 Y:2010 08 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,980 $881 Not Implemented
UF0434 # 09 Y:2010 09 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,310 $20,000 Not Implemented