Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
98
matching recommendationsSIC | 3842 | Surgical Appliances And Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0584 # 10 Y:2022 | 10 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $68,493 | $0 | Implemented |
UF0584 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $544,931 | $1,699,000 | Not Implemented |
UF0584 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $73,209 | $322,608 | Not Implemented |
UF0584 # 03 Y:2022 | 03 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $57,843 | $55,197 | Not Implemented |
UF0584 # 04 Y:2022 | 04 | 2022 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $56,623 | $65,000 | Not Implemented |
UF0584 # 05 Y:2022 | 05 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,250 | $160 | Not Implemented |
UF0584 # 06 Y:2022 | 06 | 2022 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $10,226 | $7,600 | Not Implemented |
UF0584 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,855 | $40,432 | Implemented |
UF0584 # 08 Y:2022 | 08 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,261 | $3,420 | Not Implemented |
UF0584 # 09 Y:2022 | 09 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $68,739 | $10,000 | Not Implemented |
UF0518 # 06 Y:2018 | 06 | 2018 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $109,000 | $41,200 | Implemented |
UF0518 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,401 | $0 | Implemented |
UF0518 # 03 Y:2018 | 03 | 2018 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $3,844 | $586 | Implemented |
UF0518 # 02 Y:2018 | 02 | 2018 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $9,684 | $1,980 | Implemented |
UF0518 # 01 Y:2018 | 01 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,028 | $167,216 | Implemented |
UF0518 # 05 Y:2018 | 05 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,145 | $9,600 | Implemented |
MI0336 # 07 Y:2018 | 07 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,620 | $3,230 | Not Implemented |
MI0336 # 05 Y:2018 | 05 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,515 | $626 | Not Implemented |
MI0336 # 06 Y:2018 | 06 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,709 | $2,800 | Implemented |
MI0336 # 09 Y:2018 | 09 | 2018 | INSTALL OCCUPANCY SENSORS | $492 | $1,466 | Implemented |
MI0336 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,664 | $11,634 | Implemented |
MI0336 # 03 Y:2018 | 03 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $17,738 | $3,280 | Implemented |
MI0336 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,939 | $48,821 | Implemented |
MI0336 # 01 Y:2018 | 01 | 2018 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $21,620 | $80 | Implemented |
MI0336 # 08 Y:2018 | 08 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,516 | $661 | Not Implemented |