Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 3842 | Surgical Appliances And Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0993 # 06 Y:2018 | 06 | 2018 | COVER OPEN TANKS | $3,170 | $5,040 | Not Implemented |
UD0993 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,977 | $9,300 | Implemented |
UD0993 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $2,531 | $2,940 | Implemented |
UD0993 # 03 Y:2018 | 03 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $302 | $0 | Not Implemented |
UD0993 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $392 | $0 | Not Implemented |
UD0993 # 01 Y:2018 | 01 | 2018 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $27,720 | $0 | Not Implemented |
UF0518 # 06 Y:2018 | 06 | 2018 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $109,000 | $41,200 | Implemented |
UF0518 # 05 Y:2018 | 05 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,145 | $9,600 | Implemented |
UF0518 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,401 | $0 | Implemented |
UF0518 # 03 Y:2018 | 03 | 2018 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $3,844 | $586 | Implemented |
UF0518 # 02 Y:2018 | 02 | 2018 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $9,684 | $1,980 | Implemented |
UF0518 # 01 Y:2018 | 01 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,028 | $167,216 | Implemented |
MI0336 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,939 | $48,821 | Implemented |
MI0336 # 09 Y:2018 | 09 | 2018 | INSTALL OCCUPANCY SENSORS | $492 | $1,466 | Implemented |
MI0336 # 08 Y:2018 | 08 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,516 | $661 | Not Implemented |
MI0336 # 07 Y:2018 | 07 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,620 | $3,230 | Not Implemented |
MI0336 # 06 Y:2018 | 06 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,709 | $2,800 | Implemented |
MI0336 # 05 Y:2018 | 05 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,515 | $626 | Not Implemented |
MI0336 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,664 | $11,634 | Implemented |
MI0336 # 03 Y:2018 | 03 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $17,738 | $3,280 | Implemented |
MI0336 # 01 Y:2018 | 01 | 2018 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $21,620 | $80 | Implemented |
TT0208 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,732 | $2,250 | Not Implemented |
TT0208 # 06 Y:2018 | 06 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $439 | $600 | Not Implemented |
TT0208 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $3,716 | $2,030 | Not Implemented |
TT0208 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,089 | $400 | Implemented |