IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

169

matching recommendations
Reset
SIC 385 Ophthalmic Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0419 # 09 Y:2009 09 2009 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $41,483 $4,000 Not Implemented
UF0419 # 10 Y:2009 10 2009 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE $2,671 $3,405 Not Implemented
GT0850 # 01 Y:2008 01 2008 COMBINE UTILITY METERS $2,910 $0 Not Implemented
GT0850 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,172 $10,000 Implemented
GT0850 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,480 $0 Not Implemented
GT0850 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,447 $4,800 Not Implemented
GT0850 # 05 Y:2008 05 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $23,045 $29,000 Not Implemented
GT0850 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,700 $20,540 Not Implemented
GT0850 # 07 Y:2008 07 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,170 $12,600 Not Implemented
GT0850 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,237 $7,000 Not Implemented
GT0850 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,982 $40,482 Not Implemented
GT0850 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,544 $1,580 Not Implemented
SD0314 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $173,249 $120,000 Not Implemented
SD0314 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,689 $50,000 Not Implemented
SD0314 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,440 $17,250 Not Implemented
SD0314 # 04 Y:2003 04 2003 REDESIGN PROCESS $28,616 $11,700 Not Implemented
SD0314 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,207 $48,175 Not Implemented
SD0314 # 06 Y:2003 06 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $15,709 $33,075 Not Implemented
SD0314 # 07 Y:2003 07 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,389 $0 Implemented
SD0314 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $9,097 $1,000 Implemented
SD0314 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $2,478 $450 Not Implemented
SD0314 # 10 Y:2003 10 2003 INSULATE BARE EQUIPMENT $242 $920 Implemented
SD0314 # 11 Y:2003 11 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $598 $0 Not Implemented
SD0314 # 12 Y:2003 12 2003 AUTOMATE FINISHING PROCESS $6,678 $3,294 Not Implemented
MO0270 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,783 $36,941 Implemented