Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
169
matching recommendationsSIC | 3851 | Ophthalmic Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0419 # 09 Y:2009 | 09 | 2009 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $41,483 | $4,000 | Not Implemented |
UF0419 # 10 Y:2009 | 10 | 2009 | SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE | $2,671 | $3,405 | Not Implemented |
GT0850 # 01 Y:2008 | 01 | 2008 | COMBINE UTILITY METERS | $2,910 | $0 | Not Implemented |
GT0850 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,172 | $10,000 | Implemented |
GT0850 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,480 | $0 | Not Implemented |
GT0850 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,447 | $4,800 | Not Implemented |
GT0850 # 05 Y:2008 | 05 | 2008 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $23,045 | $29,000 | Not Implemented |
GT0850 # 06 Y:2008 | 06 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,700 | $20,540 | Not Implemented |
GT0850 # 07 Y:2008 | 07 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,170 | $12,600 | Not Implemented |
GT0850 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,237 | $7,000 | Not Implemented |
GT0850 # 09 Y:2008 | 09 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,982 | $40,482 | Not Implemented |
GT0850 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,544 | $1,580 | Not Implemented |
SD0314 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $173,249 | $120,000 | Not Implemented |
SD0314 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,689 | $50,000 | Not Implemented |
SD0314 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,440 | $17,250 | Not Implemented |
SD0314 # 04 Y:2003 | 04 | 2003 | REDESIGN PROCESS | $28,616 | $11,700 | Not Implemented |
SD0314 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,207 | $48,175 | Not Implemented |
SD0314 # 06 Y:2003 | 06 | 2003 | INSTALL SPECTRAL REFLECTORS / DELAMP | $15,709 | $33,075 | Not Implemented |
SD0314 # 07 Y:2003 | 07 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,389 | $0 | Implemented |
SD0314 # 08 Y:2003 | 08 | 2003 | INSTALL OCCUPANCY SENSORS | $9,097 | $1,000 | Implemented |
SD0314 # 09 Y:2003 | 09 | 2003 | INSULATE BARE EQUIPMENT | $2,478 | $450 | Not Implemented |
SD0314 # 10 Y:2003 | 10 | 2003 | INSULATE BARE EQUIPMENT | $242 | $920 | Implemented |
SD0314 # 11 Y:2003 | 11 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $598 | $0 | Not Implemented |
SD0314 # 12 Y:2003 | 12 | 2003 | AUTOMATE FINISHING PROCESS | $6,678 | $3,294 | Not Implemented |
MO0270 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,783 | $36,941 | Implemented |