IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,153

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1021 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,902 $2,000 Implemented
UD1021 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,419 $37,053 Implemented
UD1021 # 09 Y:2020 09 2020 INSTALL OCCUPANCY SENSORS $16,106 $2,800 Implemented
IP0139 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $647 $1,350 Implemented
IP0139 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $84,001 $51,911 Implemented
IP0139 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,551 $36 Implemented
IP0139 # 01 Y:2020 01 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,243 $0 Implemented
UF0537 # 09 Y:2019 09 2019 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $37,600 $100,000 Implemented
UF0537 # 07 Y:2019 07 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,046 $914 Implemented
UF0537 # 06 Y:2019 06 2019 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,428 $500 Implemented
UF0537 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,091 $8,377 Implemented
LE0481 # 09 Y:2019 09 2019 RECOVER WASTE HEAT FROM EQUIPMENT $390 $1,850 Implemented
LE0481 # 07 Y:2019 07 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,688 $55,000 Implemented
LE0481 # 05 Y:2019 05 2019 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $50,429 $162,000 Implemented
LE0481 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,547 $11,688 Implemented
LE0481 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,057 $40 Implemented
SD0587 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,684 $52,500 Implemented
SD0587 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,075 $0 Implemented
UA0213 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,549 $1,294 Implemented
UA0213 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,098 $4,895 Implemented
UA0214 # 09 Y:2019 09 2019 PAY UTILITY BILLS ON TIME $9,417 $0 Implemented
UA0214 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,674 $35,762 Implemented
UA0214 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,341 $8,495 Implemented
UA0214 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $22,118 $50 Implemented
UA0214 # 04 Y:2019 04 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $48,099 $7,241 Implemented