IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,153

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0063 # 01 Y:1986 01 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $347 $102 Implemented
ST0063 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $518 $0 Implemented
ST0063 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,096 $537 Implemented
ST0063 # 06 Y:1986 06 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $289 $0 Implemented
TN0281 # 01 Y:1986 01 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $6,608 $4,408 Implemented
TN0281 # 05 Y:1986 05 1986 ADJUST VENTS TO MINIMIZE ENERGY USE $3,340 $0 Implemented
TN0281 # 07 Y:1986 07 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,025 $105 Implemented
TN0281 # 10 Y:1986 10 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $93 $0 Implemented
UD0187 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $509 $250 Implemented
UD0187 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $337 $429 Implemented
UD0187 # 03 Y:1986 03 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $489 $488 Implemented
CO0048 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $11,078 $47 Implemented
CO0048 # 02 Y:1985 02 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,297 $400 Implemented
CO0048 # 03 Y:1985 03 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,843 $25 Implemented
CO0048 # 04 Y:1985 04 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $541 $750 Implemented
CO0048 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $128 $300 Implemented
CO0048 # 07 Y:1985 07 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $554 $225 Implemented
CO0048 # 09 Y:1985 09 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $29,091 $2,343 Implemented
GT0264 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,470 $1,000 Implemented
GT0264 # 02 Y:1985 02 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,370 $8,000 Implemented
GT0264 # 03 Y:1985 03 1985 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $9,370 $41,000 Implemented
GT0264 # 04 Y:1985 04 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $294 $2,198 Implemented
GT0264 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $320 $0 Implemented
GT0264 # 06 Y:1985 06 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,130 $5,500 Implemented
GT0264 # 08 Y:1985 08 1985 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $2,920 $5,000 Implemented