IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,162

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0074 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $784 $225 Implemented
WM0074 # 09 Y:2015 09 2015 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,625 $1,774 Implemented
BD0456 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $1,500 Implemented
BD0456 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,006 $548 Implemented
BD0456 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $606 $400 Implemented
NC0535 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,964 $9,077 Implemented
NC0535 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $667 $2,297 Implemented
NC0535 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,917 $100 Implemented
NC0535 # 09 Y:2015 09 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,975 $1,750 Implemented
NC0535 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $598 $100 Implemented
IP0032 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,644 $16,018 Implemented
IP0032 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $659 $556 Implemented
IP0032 # 04 Y:2014 04 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,263 $0 Implemented
BS0035 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $65 $132 Implemented
BS0035 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,413 $8,156 Implemented
BS0035 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $89 $113 Implemented
BS0035 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $374 $15 Implemented
BS0035 # 05 Y:2014 05 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,366 $24,165 Implemented
BS0035 # 06 Y:2014 06 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,299 $50 Implemented
BS0035 # 08 Y:2014 08 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $452 $340 Implemented
BS0034 # 05 Y:2014 05 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $7,083 $304 Implemented
BS0034 # 06 Y:2014 06 2014 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,513 $2,503 Implemented
BS0034 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,850 $255 Implemented
BS0034 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,549 $4,061 Implemented
MZ0139 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $11,156 $7,200 Implemented