Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0481 # 09 Y:2019 09 2019 RECOVER WASTE HEAT FROM EQUIPMENT $390 $1,850 Implemented
LE0481 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,547 $11,688 Implemented
LE0481 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,057 $40 Implemented
LE0481 # 05 Y:2019 05 2019 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $50,429 $162,000 Implemented
LE0481 # 07 Y:2019 07 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,688 $55,000 Implemented
LE0299 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,684 $13,847 Implemented
LE0299 # 07 Y:2010 07 2010 INSTALL TIMERS AND/OR THERMOSTATS $697 $150 Implemented
LE0299 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,703 $800 Implemented
LE0299 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,849 $800 Implemented
LE0299 # 04 Y:2010 04 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,599 $3,000 Implemented
LE0285 # 07 Y:2009 07 2009 INSTALL TIMERS AND/OR THERMOSTATS $1,391 $50 Implemented
LE0285 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $1,389 $1,525 Implemented
SU0221 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $129 $1,155 Implemented
SU0221 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,455 $0 Implemented
SU0221 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,043 $0 Implemented
SU0221 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,388 $2,015 Implemented
SU0221 # 11 Y:2005 11 2005 INSTALL OCCUPANCY SENSORS $96 $391 Implemented
SU0221 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $320 $0 Implemented
SU0221 # 10 Y:2005 10 2005 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $259 $721 Implemented
SU0221 # 02 Y:2005 02 2005 USE SYNTHETIC LUBRICANT $1,767 $0 Implemented
LE0108 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $315 $500 Implemented
LE0108 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,738 $3,120 Implemented
LE0108 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,248 $0 Implemented
HO0154 # 06 Y:1997 06 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $2,563 $10,000 Implemented
HO0154 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,944 $21,668 Implemented