IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

98

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0006 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $114 $124 Not Implemented
TA0006 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $100 $3 Not Implemented
AM0361 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $20,600 $41,200 n/a
AM0361 # 02 Y:2000 02 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $30,000 $2,905 n/a
AM0361 # 01 Y:2000 01 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $576,720 $201,440 n/a
AM0361 # 04 Y:2000 04 2000 DISCONNECT BALLASTS $4,920 $600 n/a
AM0361 # 05 Y:2000 05 2000 PAY BILLS ON TIME TO AVOID LATE FEES $4,274 $0 n/a
AM0361 # 06 Y:2000 06 2000 DISCONNECT BALLASTS $1,930 $300 n/a
AM0361 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $410 $100 n/a
AM0361 # 08 Y:2000 08 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $430 $120 n/a
KG0012 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,151 $2,099 Implemented
KG0012 # 06 Y:1994 06 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $648 $20 Not Implemented
KG0012 # 05 Y:1994 05 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $857 $300 Implemented
KG0012 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,135 $468 Not Implemented
KG0012 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,343 $14,260 Implemented
KG0012 # 01 Y:1994 01 1994 INSTALL TIMERS AND/OR THERMOSTATS $24,209 $3,300 Implemented
AM0017 # 01 Y:1988 01 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,970 $190 Implemented
AM0017 # 08 Y:1988 08 1988 INSULATE BARE EQUIPMENT $359 $1,670 Implemented
AM0017 # 07 Y:1988 07 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $849 $3,033 Implemented
AM0017 # 05 Y:1988 05 1988 INSTALL SET-BACK TIMERS $550 $0 Implemented
AM0017 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $875 $300 Implemented
AM0017 # 03 Y:1988 03 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,376 $1,100 Implemented
AM0017 # 02 Y:1988 02 1988 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,010 $360 Implemented