Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,558
matching recommendationsSIC | 39 | Miscellaneous Manufacturing Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0341 # 03 Y:2003 | 03 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,327 | $40 | Implemented |
AS0341 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,287 | $260 | Implemented |
AS0341 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $193 | $442 | Not Implemented |
AS0341 # 06 Y:2003 | 06 | 2003 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $20,939 | $0 | Not Implemented |
AS0341 # 07 Y:2003 | 07 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $23,277 | $14,364 | Not Implemented |
AS0341 # 08 Y:2003 | 08 | 2003 | INSTALL AUTOMATIC PACKING EQUIPMENT | $40,000 | $616 | Not Implemented |
BD0222 # 01 Y:2002 | 01 | 2002 | SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM | $185,274 | $20,000 | Not Implemented |
BD0222 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,898 | $12,020 | Implemented |
BD0222 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,835 | $2,232 | Not Implemented |
BD0222 # 04 Y:2002 | 04 | 2002 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $6,079 | $6,000 | Not Implemented |
BD0222 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,027 | $1,000 | Not Implemented |
BD0222 # 06 Y:2002 | 06 | 2002 | INSTALL TURBULATORS | $2,272 | $3,500 | Not Implemented |
BD0222 # 07 Y:2002 | 07 | 2002 | INSTALL OCCUPANCY SENSORS | $2,219 | $1,425 | Not Implemented |
BD0222 # 08 Y:2002 | 08 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,901 | $2,000 | Not Implemented |
BD0222 # 09 Y:2002 | 09 | 2002 | INSULATE BARE EQUIPMENT | $1,141 | $1,018 | Not Implemented |
BD0222 # 10 Y:2002 | 10 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $652 | $0 | Not Implemented |
BD0222 # 11 Y:2002 | 11 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10 | $200 | Not Implemented |
BD0222 # 12 Y:2002 | 12 | 2002 | REPAIR AND ELIMINATE STEAM LEAKS | $126 | $100 | Not Implemented |
BD0222 # 13 Y:2002 | 13 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $70,000 | $40,000 | Implemented |
BD0222 # 14 Y:2002 | 14 | 2002 | AUTOMATE PAYROLL SYSTEM | $24,960 | $17,300 | Implemented |
BD0222 # 15 Y:2002 | 15 | 2002 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,004 | $0 | Not Implemented |
UU0031 # 01 Y:2002 | 01 | 2002 | OPTIMIZE PLANT POWER FACTOR | $12,207 | $18,000 | Not Implemented |
UU0031 # 02 Y:2002 | 02 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,112 | $0 | Not Implemented |
UU0031 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,692 | $20 | Not Implemented |
UU0031 # 04 Y:2002 | 04 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $121,213 | $2,000,000 | Not Implemented |