IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,558

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0031 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58 $366 Not Implemented
UU0029 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,710 $0 Not Implemented
UU0029 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $1,000 $1,570 Implemented
UU0029 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,840 $8,250 Not Implemented
UU0029 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $290 $530 Not Implemented
UU0029 # 05 Y:2002 05 2002 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $229 $1,650 Not Implemented
LE0143 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,545 $2,500 Not Implemented
LE0143 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,009 $1,000 Not Implemented
LE0143 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,286 $0 Implemented
LE0143 # 04 Y:2002 04 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $166 $195 Not Implemented
LE0143 # 05 Y:2002 05 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $655 $6,500 Not Implemented
LE0143 # 06 Y:2002 06 2002 USE SYNTHETIC LUBRICANT $793 $400 Implemented
BD0215 # 01 Y:2002 01 2002 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $20,511 $4,000 Implemented
BD0215 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,289 $1,500 Not Implemented
BD0215 # 03 Y:2002 03 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,792 $12,000 Not Implemented
BD0215 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $1,820 $1,875 Not Implemented
BD0215 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,290 $1,000 Not Implemented
BD0215 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $779 $0 Not Implemented
BD0215 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $562 $400 Implemented
BD0215 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $482 $334 Not Implemented
BD0215 # 09 Y:2002 09 2002 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $43,076 $3,400 Not Implemented
BD0215 # 10 Y:2002 10 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $17,159 $18,000 Not Implemented
BD0215 # 11 Y:2002 11 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,300 $102 Not Implemented
SD0297 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,530 $39,000 Not Implemented
SD0297 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $15,891 $500 Implemented