IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,558

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0112 # 02 Y:1998 02 1998 REPAIR OR REPLACE STEAM TRAPS $4,912 $990 Implemented
OD0112 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $642 $800 Implemented
OD0112 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $253 $50 Implemented
OD0112 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,125 $8,000 Implemented
OD0112 # 06 Y:1998 06 1998 MINIMIZE WATER USAGE $105 $0 Not Implemented
OD0112 # 07 Y:1998 07 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,920 $550 Not Implemented
OK0549 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,094 $90,923 Not Implemented
OK0549 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,165 $3,300 Implemented
OK0549 # 03 Y:1998 03 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,469 $170 Implemented
OK0549 # 04 Y:1998 04 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,060 $680 Not Implemented
OK0549 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $24,960 $10,000 Implemented
OK0549 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $6,240 $2,044 Implemented
OK0549 # 07 Y:1998 07 1998 METER WASTE WATER $1,377 $0 Not Implemented
UM0122 # 01 Y:1998 01 1998 INSTALL OCCUPANCY SENSORS $10,711 $6,800 Not Implemented
UM0122 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $557 $1,000 Not Implemented
UM0122 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $950 $1,470 Not Implemented
UM0122 # 04 Y:1998 04 1998 USE A RAG RECYCLE SERVICE $5,818 $0 Not Implemented
UM0122 # 05 Y:1998 05 1998 METER WASTE WATER $761 $150 Not Implemented
UM0122 # 06 Y:1998 06 1998 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $29,300 $0 Not Implemented
WI0323 # 01 Y:1998 01 1998 TREAT AND REUSE RINSE WATERS $6,555 $1,475 Not Implemented
WI0323 # 02 Y:1998 02 1998 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $2,629 $0 Implemented
WI0323 # 03 Y:1998 03 1998 INSTALL TIMERS AND/OR THERMOSTATS $2,343 $600 Not Implemented
WI0323 # 04 Y:1998 04 1998 PAY BILLS ON TIME TO AVOID LATE FEES $820 $0 Implemented
WI0323 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $183 $468 Not Implemented
UF0200 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,619 $5,500 Not Implemented