IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0514 # 03 Y:2022 03 2022 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $9,435 $4,628 Not Implemented
AS0514 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,222 $8,635 Not Implemented
AS0514 # 09 Y:2022 09 2022 INSTALL OCCUPANCY SENSORS $498 $216 Not Implemented
AS0514 # 01 Y:2022 01 2022 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $138,858 $8,368 Not Implemented
AS0514 # 05 Y:2022 05 2022 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $7,266 $30,762 Not Implemented
AS0514 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $10,545 $141,340 Not Implemented
AS0514 # 06 Y:2022 06 2022 UPGRADE CONTROLS ON COMPRESSORS $3,883 $1,160 Not Implemented
AS0514 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $772 $59 Not Implemented
AS0514 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $799 $1,584 Not Implemented
AS0341 # 08 Y:2003 08 2003 $40,000 $616 Not Implemented
AS0341 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,287 $260 Implemented
AS0341 # 07 Y:2003 07 2003 $23,277 $14,364 Not Implemented
AS0341 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $193 $442 Not Implemented
AS0341 # 06 Y:2003 06 2003 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $20,939 $0 Not Implemented
AS0341 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,096 $6,789 Not Implemented
AS0341 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $834 $891 Not Implemented
AS0341 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,327 $40 Implemented
AS0199 # 12 Y:1997 12 1997 INSTALL OCCUPANCY SENSORS $1,492 $2,250 Not Implemented
AS0199 # 07 Y:1997 07 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,995 $13,000 Not Implemented
AS0199 # 11 Y:1997 11 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,037 $0 Implemented
AS0199 # 10 Y:1997 10 1997 INSTALL SKYLIGHTS $1,207 $1,200 Not Implemented
AS0199 # 09 Y:1997 09 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $396 $570 Implemented
AS0199 # 04 Y:1997 04 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,593 $12,000 Not Implemented
AS0199 # 01 Y:1997 01 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $410 $0 Implemented
AS0199 # 03 Y:1997 03 1997 USE SYNTHETIC LUBRICANT $570 $300 Not Implemented