IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

98

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0649 # 08 Y:2024 08 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $916 $3,000 n/a
SD0649 # 09 Y:2024 09 2024 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $12,769 $40,200 n/a
SJ0012 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $26 $0 n/a
SJ0012 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,511 $11,438 n/a
SJ0012 # 06 Y:2024 06 2024 USE MINIMUM SAFE OVEN VENTILATION $157 $217 n/a
SJ0012 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,778 $22,286 n/a
SJ0012 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $151,265 $402,860 n/a
SJ0012 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $215 $0 n/a
SD0649 # 07 Y:2024 07 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $40,936 $125,410 n/a
SD0649 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,035 $39,675 n/a
SD0649 # 06 Y:2024 06 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $570,483 $0 n/a
SD0649 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $742,364 $1,089,169 n/a
SD0649 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $142,164 $183,960 n/a
SD0649 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,802 $16,517 n/a
SD0649 # 03 Y:2024 03 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $657,585 $0 n/a
SJ0012 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,374 $0 n/a
SD0587 # 04 Y:2019 04 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $631 $522 Not Implemented
SD0587 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,956 $5,187 Not Implemented
SD0587 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,075 $0 Implemented
SD0587 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,684 $52,500 Implemented
SD0555 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $489 $600 Implemented
SD0555 # 05 Y:2017 05 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $445 $850 Not Implemented
SD0555 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,771 $1,100 Implemented
SD0555 # 01 Y:2017 01 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $18,916 $65,600 Not Implemented
SD0555 # 03 Y:2017 03 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,035 $6,550 Not Implemented