IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1069 # 05 Y:2022 05 2022 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $4,394 $1,540 Implemented
OK1069 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $156 $488 Implemented
OK1069 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $612 $304 Implemented
OK1069 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,879 $0 Implemented
OK1069 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,392 $27,027 Implemented
OK1011 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,176 $71,250 Implemented
OK1011 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $13,080 $57,161 Not Implemented
OK1011 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,937 $15,573 Implemented
OK1011 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,528 $8,106 Not Implemented
OK1011 # 07 Y:2019 07 2019 INSTALL SET-BACK TIMERS $480 $240 Not Implemented
OK1011 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $5,110 $63 Not Implemented
OK1011 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,499 $1,898 Implemented
OK1011 # 09 Y:2019 09 2019 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $1,628 $0 Implemented
OK1011 # 08 Y:2019 08 2019 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $18,744 $35,736 Not Implemented
OK0930 # 03 Y:2015 03 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,131 $0 Implemented
OK0930 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,351 $10,800 Not Implemented
OK0930 # 01 Y:2015 01 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $137,102 $90,000 Not Implemented
OK0602 # 03 Y:2000 03 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $26,183 $35,000 Not Implemented
OK0602 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,151 $14,545 Implemented
OK0602 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $276 $1,620 Not Implemented
OK0602 # 08 Y:2000 08 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $8,333 $0 Not Implemented
OK0602 # 07 Y:2000 07 2000 $122,640 $200,000 Not Implemented
OK0602 # 06 Y:2000 06 2000 $229,950 $32,400 Not Implemented
OK0602 # 02 Y:2000 02 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,001 $10,500 Not Implemented
OK0602 # 04 Y:2000 04 2000 INSTALL SKYLIGHTS $9,262 $5,460 Not Implemented