IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

83

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0237 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,340 $23,500 n/a
UU0237 # 02 Y:2024 02 2024 REDUCE VENTILATION AIR $7,109 $28,950 n/a
UU0237 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $10,990 $184,280 n/a
UU0237 # 04 Y:2024 04 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $6,350 $8,970 n/a
UU0237 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,430 $3,000 n/a
UU0237 # 07 Y:2024 07 2024 PAY UTILITY BILLS ON TIME $210 $150 n/a
UU0237 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,040 $375 n/a
UU0205 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,293 $198 Implemented
UU0205 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $382 $720 Not Implemented
UU0205 # 06 Y:2022 06 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,070 $150 Not Implemented
UU0205 # 01 Y:2022 01 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,629 $10,629 Not Implemented
UU0205 # 02 Y:2022 02 2022 USE POWER DURING OFF-PEAK PERIODS $10,548 $18,900 Not Implemented
UU0205 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,310 $28,263 Not Implemented
UU0205 # 04 Y:2022 04 2022 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,404 $9,200 Not Implemented
BS0034 # 05 Y:2014 05 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $7,083 $304 Implemented
BS0034 # 04 Y:2014 04 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $14,073 $49,835 Not Implemented
BS0034 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $10,406 $20,000 Not Implemented
BS0034 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $74,212 $31,860 Not Implemented
BS0034 # 07 Y:2014 07 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $946 $2,100 Not Implemented
BS0034 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,549 $4,061 Implemented
BS0034 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,850 $255 Implemented
BS0034 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,966 $45,410 Not Implemented
BS0034 # 06 Y:2014 06 2014 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,513 $2,503 Implemented
AM0648 # 05 Y:2013 05 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,304 $45,000 Implemented
AM0648 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $10,740 $0 Implemented