Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
59
matching recommendationsSIC | 39 | Miscellaneous Manufacturing Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0073 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,080 | $860 | Not Implemented |
UU0073 # 01 Y:2004 | 01 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $8,250 | $8,000 | Not Implemented |
UU0073 # 05 Y:2004 | 05 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,700 | $2,500 | Not Implemented |
UU0073 # 07 Y:2004 | 07 | 2004 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $130 | $0 | Not Implemented |
UU0073 # 06 Y:2004 | 06 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $10,500 | $15,000 | Not Implemented |
UU0073 # 04 Y:2004 | 04 | 2004 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $2,434 | $0 | Not Implemented |
UU0073 # 03 Y:2004 | 03 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $990 | $6,000 | Not Implemented |
UD0708 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $45,575 | $35,400 | Not Implemented |
UD0708 # 12 Y:2004 | 12 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,677 | $5,152 | Not Implemented |
UD0708 # 13 Y:2004 | 13 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,344 | $0 | Not Implemented |
UD0708 # 05 Y:2004 | 05 | 2004 | INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES | $39,175 | $120,100 | Implemented |
UD0708 # 10 Y:2004 | 10 | 2004 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $4,013 | $780 | Not Implemented |
UD0708 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,364 | $20,952 | Implemented |
UD0708 # 09 Y:2004 | 09 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,451 | $0 | Implemented |
UD0708 # 11 Y:2004 | 11 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,678 | $10,931 | Implemented |
UD0708 # 07 Y:2004 | 07 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $20,091 | $0 | Not Implemented |
UD0708 # 06 Y:2004 | 06 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,586 | $0 | Implemented |
UD0708 # 01 Y:2004 | 01 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $625,410 | $325,000 | Not Implemented |
UD0708 # 14 Y:2004 | 14 | 2004 | INSULATE BARE EQUIPMENT | $2,927 | $986 | Not Implemented |
UD0708 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $41,459 | $3,900 | Implemented |
UD0708 # 02 Y:2004 | 02 | 2004 | DISCONNECT BALLASTS | $53,161 | $3,105 | Implemented |
UU0070 # 04 Y:2004 | 04 | 2004 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $73,401 | $750,000 | Implemented |
UU0070 # 05 Y:2004 | 05 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $70,000 | $18,000 | Implemented |
UU0070 # 01 Y:2004 | 01 | 2004 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,370,474 | $22,000,000 | Not Implemented |
UU0070 # 02 Y:2004 | 02 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $95,199 | $0 | Implemented |