IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

303

matching recommendations
Reset
SIC 394 Toys And Sporting Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0205 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,293 $198 Implemented
UD1021 # 09 Y:2020 09 2020 INSTALL OCCUPANCY SENSORS $16,106 $2,800 Implemented
UD1021 # 02 Y:2020 02 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $32,724 $0 Implemented
UD1021 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,342 $0 Implemented
UD1021 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,841 $0 Implemented
UD1021 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,283 $0 Implemented
UD1021 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,902 $2,000 Implemented
UD1021 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,419 $37,053 Implemented
UF0537 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,091 $8,377 Implemented
UF0537 # 09 Y:2019 09 2019 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $37,600 $100,000 Implemented
UF0537 # 06 Y:2019 06 2019 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,428 $500 Implemented
UF0537 # 07 Y:2019 07 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,046 $914 Implemented
UA0214 # 07 Y:2019 07 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $57,024 $7,375 Implemented
UA0214 # 09 Y:2019 09 2019 PAY UTILITY BILLS ON TIME $9,417 $0 Implemented
UA0214 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $22,118 $50 Implemented
UA0214 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,341 $8,495 Implemented
UA0214 # 04 Y:2019 04 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $48,099 $7,241 Implemented
UA0214 # 05 Y:2019 05 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,824 $6,704 Implemented
UA0214 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,674 $35,762 Implemented
OK1008 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,328 $2,128 Implemented
OK1008 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $107,652 $264,795 Implemented
OK1008 # 06 Y:2019 06 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $11,069 $0 Implemented
MA0798 # 09 Y:2019 09 2019 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $512 $200 Implemented
MA0798 # 02 Y:2019 02 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,484 $80,000 Implemented
MA0798 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,625 $48,500 Implemented