Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
303
matching recommendationsSIC | 394 | Toys And Sporting Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0205 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,293 | $198 | Implemented |
UD1021 # 09 Y:2020 | 09 | 2020 | INSTALL OCCUPANCY SENSORS | $16,106 | $2,800 | Implemented |
UD1021 # 02 Y:2020 | 02 | 2020 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $32,724 | $0 | Implemented |
UD1021 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,342 | $0 | Implemented |
UD1021 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,841 | $0 | Implemented |
UD1021 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,283 | $0 | Implemented |
UD1021 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,902 | $2,000 | Implemented |
UD1021 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,419 | $37,053 | Implemented |
UF0537 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,091 | $8,377 | Implemented |
UF0537 # 09 Y:2019 | 09 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $37,600 | $100,000 | Implemented |
UF0537 # 06 Y:2019 | 06 | 2019 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,428 | $500 | Implemented |
UF0537 # 07 Y:2019 | 07 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,046 | $914 | Implemented |
UA0214 # 07 Y:2019 | 07 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $57,024 | $7,375 | Implemented |
UA0214 # 09 Y:2019 | 09 | 2019 | PAY UTILITY BILLS ON TIME | $9,417 | $0 | Implemented |
UA0214 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,118 | $50 | Implemented |
UA0214 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,341 | $8,495 | Implemented |
UA0214 # 04 Y:2019 | 04 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $48,099 | $7,241 | Implemented |
UA0214 # 05 Y:2019 | 05 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,824 | $6,704 | Implemented |
UA0214 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,674 | $35,762 | Implemented |
OK1008 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,328 | $2,128 | Implemented |
OK1008 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $107,652 | $264,795 | Implemented |
OK1008 # 06 Y:2019 | 06 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $11,069 | $0 | Implemented |
MA0798 # 09 Y:2019 | 09 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $512 | $200 | Implemented |
MA0798 # 02 Y:2019 | 02 | 2019 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $18,484 | $80,000 | Implemented |
MA0798 # 01 Y:2019 | 01 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,625 | $48,500 | Implemented |