IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 394 Toys And Sporting Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0215 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $779 $0 Not Implemented
BD0215 # 01 Y:2002 01 2002 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $20,511 $4,000 Implemented
BD0215 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,289 $1,500 Not Implemented
BD0215 # 03 Y:2002 03 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,792 $12,000 Not Implemented
BD0215 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $1,820 $1,875 Not Implemented
BD0215 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,290 $1,000 Not Implemented
IC0019 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,836 $20,599 Not Implemented
IC0019 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,091 $1,700 Implemented
IC0019 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $272 $471 Implemented
IC0019 # 04 Y:2001 04 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $28,000 $2,737 Implemented
IC0019 # 05 Y:2001 05 2001 MODIFY WORKLOAD $117,000 $57,100 Not Implemented
IC0019 # 06 Y:2001 06 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $9,945 $40 Implemented
WI0380 # 02 Y:2000 02 2000 AUTOMATE FINISHING PROCESS $22,313 $2,000 Not Implemented
WI0380 # 01 Y:2000 01 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $44,625 $68,300 Not Implemented
WI0380 # 11 Y:2000 11 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $214 $1,020 Not Implemented
WI0380 # 03 Y:2000 03 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $6,415 $25,000 Not Implemented
WI0380 # 04 Y:2000 04 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,068 $6,000 Not Implemented
WI0380 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $576 $0 Not Implemented
WI0380 # 06 Y:2000 06 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,960 $0 Not Implemented
WI0380 # 07 Y:2000 07 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $1,671 $0 Not Implemented
WI0380 # 08 Y:2000 08 2000 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $1,159 $1,000 Not Implemented
WI0380 # 09 Y:2000 09 2000 RECOVER WASTE HEAT FROM EQUIPMENT $845 $1,000 Not Implemented
WI0380 # 10 Y:2000 10 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $532 $0 Not Implemented
WI0252 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $371 $800 Not Implemented
WI0252 # 06 Y:1995 06 1995 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $690 $1,000 Not Implemented