IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

632

matching recommendations
Reset
SIC 394 Toys And Sporting Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0151 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $135 $2,510 Implemented
OR0151 # 05 Y:1992 05 1992 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,621 $5,299 Implemented
MO0066 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,899 $18,800 Implemented
MO0066 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,249 $1,100 Implemented
MO0066 # 03 Y:1992 03 1992 RECOVER AND REUSE COOLING WATER $3,103 $640 Not Implemented
MO0066 # 04 Y:1992 04 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $224 $250 Not Implemented
MO0066 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $439 $4,000 Implemented
MO0066 # 06 Y:1992 06 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $311 $210 Implemented
MO0066 # 07 Y:1992 07 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,207 $1,200 Implemented
MO0066 # 08 Y:1992 08 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,433 $973 Not Implemented
MO0066 # 09 Y:1992 09 1992 INSULATE BARE EQUIPMENT $208 $69 Not Implemented
GT0467 # 06 Y:1992 06 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $346 $0 Not Implemented
AS0058 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,257 $64,053 Implemented
AS0058 # 02 Y:1992 02 1992 USE HEAT PUMP FOR SPACE CONDITIONING $33,994 $182,325 Implemented
AS0058 # 03 Y:1992 03 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $2,531 $3,100 Implemented
AS0058 # 04 Y:1992 04 1992 RECOVER WASTE HEAT FROM EQUIPMENT $776 $1,400 Implemented
AS0058 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,087 $200 Implemented
AS0058 # 06 Y:1992 06 1992 REDUCE VENTILATION AIR $470 $400 Implemented
AS0058 # 07 Y:1992 07 1992 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $539 $114 Implemented
AS0058 # 08 Y:1992 08 1992 INSULATE BARE EQUIPMENT $273 $100 Implemented
AS0058 # 09 Y:1992 09 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,036 $3,213 Implemented
AS0058 # 10 Y:1992 10 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $475 $0 Implemented
GT0467 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,175 $4,000 Not Implemented
GT0467 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $239 $1,166 Not Implemented
GT0467 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $60 $140 Not Implemented