Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

137

matching recommendations
Reset
SIC 3944 Games, Toys, and Children's Vehicles, Except Dolls and Bicycles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1021 # 10 Y:2020 10 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,902 $7,800 Not Implemented
UD1021 # 03 Y:2020 03 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,965 $1,400 Not Implemented
UD1021 # 02 Y:2020 02 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $32,724 $0 Implemented
UD1021 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,283 $0 Implemented
UD1021 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,419 $37,053 Implemented
UD1021 # 07 Y:2020 07 2020 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,594 $1,590 Not Implemented
UD1021 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,902 $2,000 Implemented
UD1021 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,841 $0 Implemented
UD1021 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,342 $0 Implemented
UD1021 # 11 Y:2020 11 2020 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $249 $240 Not Implemented
UD1021 # 09 Y:2020 09 2020 INSTALL OCCUPANCY SENSORS $16,106 $2,800 Implemented
MA0798 # 08 Y:2019 08 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $922 $978 Not Implemented
MA0798 # 07 Y:2019 07 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,849 $2,001 Implemented
MA0798 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,625 $48,500 Implemented
MA0798 # 09 Y:2019 09 2019 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $512 $200 Implemented
MA0798 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,904 $2,765 Not Implemented
MA0798 # 06 Y:2019 06 2019 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $2,585 $500 Not Implemented
MA0798 # 02 Y:2019 02 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,484 $80,000 Implemented
MA0798 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $7,569 $8,930 Not Implemented
MA0798 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $3,333 $1,801 Implemented
MZ0199 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,470 $116,250 Not Implemented
MZ0199 # 01 Y:2015 01 2015 CONDENSE OPERATION INTO ONE BUILDING $14,201 $28,800 Not Implemented
MZ0199 # 02 Y:2015 02 2015 CONDENSE OPERATION INTO ONE BUILDING $19,376 $2,500 Not Implemented
MZ0199 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,508 $440 Not Implemented
MZ0199 # 06 Y:2015 06 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,502 $27,000 Not Implemented