Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
53
matching recommendationsSIC | 3949 | Sporting And Athletic Goods, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0514 # 09 Y:2022 | 09 | 2022 | INSTALL OCCUPANCY SENSORS | $498 | $216 | Not Implemented |
AS0514 # 08 Y:2022 | 08 | 2022 | INSTALL OCCUPANCY SENSORS | $772 | $59 | Not Implemented |
AS0514 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $799 | $1,584 | Not Implemented |
AS0514 # 06 Y:2022 | 06 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $3,883 | $1,160 | Not Implemented |
AS0514 # 05 Y:2022 | 05 | 2022 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $7,266 | $30,762 | Not Implemented |
AS0514 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,222 | $8,635 | Not Implemented |
AS0514 # 03 Y:2022 | 03 | 2022 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $9,435 | $4,628 | Not Implemented |
AS0514 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $10,545 | $141,340 | Not Implemented |
AS0514 # 01 Y:2022 | 01 | 2022 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $138,858 | $8,368 | Not Implemented |
AS0199 # 03 Y:1997 | 03 | 1997 | USE SYNTHETIC LUBRICANT | $570 | $300 | Not Implemented |
AS0199 # 08 Y:1997 | 08 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,635 | $3,183 | Implemented |
AS0199 # 10 Y:1997 | 10 | 1997 | INSTALL SKYLIGHTS | $1,207 | $1,200 | Not Implemented |
AS0199 # 12 Y:1997 | 12 | 1997 | INSTALL OCCUPANCY SENSORS | $1,492 | $2,250 | Not Implemented |
AS0199 # 13 Y:1997 | 13 | 1997 | RECYCLE NONFERROUS DUST | $176 | $0 | Not Implemented |
AS0199 # 14 Y:1997 | 14 | 1997 | CONDENSE OPERATION INTO ONE BUILDING | $205,047 | $15,000 | Not Implemented |
AS0199 # 09 Y:1997 | 09 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $396 | $570 | Implemented |
AS0199 # 07 Y:1997 | 07 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,995 | $13,000 | Not Implemented |
AS0199 # 06 Y:1997 | 06 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,411 | $3,015 | Not Implemented |
AS0199 # 05 Y:1997 | 05 | 1997 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $10,117 | $7,000 | Not Implemented |
AS0199 # 04 Y:1997 | 04 | 1997 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,593 | $12,000 | Not Implemented |
AS0199 # 11 Y:1997 | 11 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,037 | $0 | Implemented |
AS0199 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,976 | $140 | Implemented |
AS0199 # 01 Y:1997 | 01 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $410 | $0 | Implemented |
AS0197 # 11 Y:1997 | 11 | 1997 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $17,366 | $4,500 | Not Implemented |
AS0197 # 10 Y:1997 | 10 | 1997 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $1,093 | $779 | Not Implemented |