Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 399 | Miscellaneous Manufactures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1127 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,612 | $4,557 | n/a |
OK1127 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $565 | $3,300 | n/a |
OK1127 # 03 Y:2024 | 03 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,589 | $975 | n/a |
OK1127 # 05 Y:2024 | 05 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $6,939 | $58,500 | n/a |
OK1127 # 06 Y:2024 | 06 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $2,477 | $5,850 | n/a |
OK1127 # 07 Y:2024 | 07 | 2024 | OPTIMIZE PLANT POWER FACTOR | $1,583 | $11,180 | n/a |
OK1127 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,761 | $262,800 | n/a |
OK1069 # 05 Y:2022 | 05 | 2022 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $4,394 | $1,540 | Implemented |
OK1069 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $612 | $304 | Implemented |
OK1069 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,392 | $27,027 | Implemented |
OK1069 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $156 | $488 | Implemented |
OK1069 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,879 | $0 | Implemented |
OK1011 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,528 | $8,106 | Not Implemented |
OK1011 # 08 Y:2019 | 08 | 2019 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $18,744 | $35,736 | Not Implemented |
OK1011 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,937 | $15,573 | Implemented |
OK1011 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,176 | $71,250 | Implemented |
OK1011 # 05 Y:2019 | 05 | 2019 | OPTIMIZE PLANT POWER FACTOR | $13,080 | $57,161 | Not Implemented |
OK1011 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $5,110 | $63 | Not Implemented |
OK1011 # 07 Y:2019 | 07 | 2019 | INSTALL SET-BACK TIMERS | $480 | $240 | Not Implemented |
OK1011 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,499 | $1,898 | Implemented |
OK1011 # 09 Y:2019 | 09 | 2019 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $1,628 | $0 | Implemented |
OK0930 # 01 Y:2015 | 01 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $137,102 | $90,000 | Not Implemented |
OK0930 # 02 Y:2015 | 02 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $17,351 | $10,800 | Not Implemented |
OK0930 # 03 Y:2015 | 03 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,131 | $0 | Implemented |
OK0602 # 05 Y:2000 | 05 | 2000 | INSTALL OCCUPANCY SENSORS | $276 | $1,620 | Not Implemented |