IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

138

matching recommendations
Reset
SIC 3996 Hard Surface Floor Coverings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0869 # 01 Y:2009 01 2009 REPAIR AND ELIMINATE STEAM LEAKS $7,130 $2,100 Implemented
GT0869 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $352 $0 Implemented
GT0869 # 03 Y:2009 03 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,117 $890 Implemented
GT0869 # 04 Y:2009 04 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,201 $900 Not Implemented
GT0869 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,586 $42,920 Implemented
GT0869 # 06 Y:2009 06 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,715 $17,250 Not Implemented
GT0869 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,291 $4,515 Not Implemented
UA0007 # 01 Y:2007 01 2007 USE PHOTOCELL CONTROLS $1,443 $494 Implemented
UA0007 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,268 $56,213 Not Implemented
UA0007 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $1,149 $766 Not Implemented
UA0007 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $141 $270 Not Implemented
UA0007 # 05 Y:2007 05 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $11,900 $0 Implemented
UA0007 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $1,759 $309 Not Implemented
UA0007 # 07 Y:2007 07 2007 INSULATE BARE EQUIPMENT $1,590 $153 Not Implemented
UA0007 # 08 Y:2007 08 2007 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $23,435 $0 Implemented
UA0007 # 09 Y:2007 09 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,816 $1,400 Not Implemented
UA0007 # 10 Y:2007 10 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,456 $0 Not Implemented
UA0007 # 11 Y:2007 11 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,335 $7,017 Not Implemented
UA0007 # 12 Y:2007 12 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,979 $1,979 Not Implemented
UA0007 # 13 Y:2007 13 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $717 $1,940 Not Implemented
UA0007 # 14 Y:2007 14 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $768 $0 Not Implemented
UA0007 # 15 Y:2007 15 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,267 $250 Not Implemented
AM0517 # 01 Y:2006 01 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $113,000 $1,300 Implemented
AM0517 # 02 Y:2006 02 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $25,400 $600 Implemented
AM0517 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $21,460 $60,000 Implemented