IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 3996 Hard Surface Floor Coverings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1011 # 08 Y:2019 08 2019 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $18,744 $35,736 Not Implemented
OK1011 # 07 Y:2019 07 2019 INSTALL SET-BACK TIMERS $480 $240 Not Implemented
OK1011 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $5,110 $63 Not Implemented
OK1011 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $13,080 $57,161 Not Implemented
OK1011 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,176 $71,250 Implemented
OK1011 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,937 $15,573 Implemented
OK1011 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,528 $8,106 Not Implemented
OK1011 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,499 $1,898 Implemented
OK1011 # 09 Y:2019 09 2019 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $1,628 $0 Implemented
OK0602 # 04 Y:2000 04 2000 INSTALL SKYLIGHTS $9,262 $5,460 Not Implemented
OK0602 # 08 Y:2000 08 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $8,333 $0 Not Implemented
OK0602 # 07 Y:2000 07 2000 $122,640 $200,000 Not Implemented
OK0602 # 06 Y:2000 06 2000 $229,950 $32,400 Not Implemented
OK0602 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $276 $1,620 Not Implemented
OK0602 # 03 Y:2000 03 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $26,183 $35,000 Not Implemented
OK0602 # 02 Y:2000 02 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,001 $10,500 Not Implemented
OK0602 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,151 $14,545 Implemented
OK0341 # 01 Y:1991 01 1991 INSTALL TIMERS AND/OR THERMOSTATS $355 $245 Implemented
OK0341 # 09 Y:1991 09 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,226 $2,900 Implemented
OK0341 # 08 Y:1991 08 1991 REPAIR AND ELIMINATE STEAM LEAKS $443 $740 Implemented
OK0341 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $846 $1,336 Implemented
OK0341 # 06 Y:1991 06 1991 INSTALL SET-BACK TIMERS $19,001 $13,510 Implemented
OK0341 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,481 $1,800 Implemented
OK0341 # 04 Y:1991 04 1991 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $14,080 $38,500 Implemented
OK0341 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,241 $791 Implemented