IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
SIC 3999 Manufacturing Industries, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0026 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $359 $1,000 Not Implemented
AM0753 # 11 Y:2018 11 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $871 $829 Not Implemented
AM0753 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $30,100 $0 Not Implemented
AM0753 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,122 $4,000 Not Implemented
AM0753 # 03 Y:2018 03 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $17,100 $0 Not Implemented
AM0753 # 04 Y:2018 04 2018 METER WASTE WATER $6,905 $2,650 Not Implemented
AM0753 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,750 $0 Not Implemented
AM0753 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,377 $5,228 Implemented
AM0753 # 08 Y:2018 08 2018 INSTALL OCCUPANCY SENSORS $1,662 $1,732 Not Implemented
AM0753 # 09 Y:2018 09 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,326 $8 Not Implemented
AM0753 # 10 Y:2018 10 2018 PAY UTILITY BILLS ON TIME $1,108 $0 Not Implemented
AM0753 # 12 Y:2018 12 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $635 $258 Not Implemented
AM0753 # 05 Y:2018 05 2018 OPTIMIZE PLANT POWER FACTOR $5,666 $14,090 Not Implemented
TA0006 # 02 Y:2001 02 2001 COMBINE UTILITY METERS $9,444 $19,000 Implemented
TA0006 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $100 $3 Not Implemented
TA0006 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $114 $124 Not Implemented
TA0006 # 05 Y:2001 05 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $450 $35 Implemented
TA0006 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,518 $0 Implemented
TA0006 # 03 Y:2001 03 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,060 $367 Implemented
TA0006 # 01 Y:2001 01 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $89,376 $40,000 n/a
AM0361 # 05 Y:2000 05 2000 PAY BILLS ON TIME TO AVOID LATE FEES $4,274 $0 n/a
AM0361 # 06 Y:2000 06 2000 DISCONNECT BALLASTS $1,930 $300 n/a
AM0361 # 04 Y:2000 04 2000 DISCONNECT BALLASTS $4,920 $600 n/a
AM0361 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $20,600 $41,200 n/a
AM0361 # 02 Y:2000 02 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $30,000 $2,905 n/a