Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 3999 | Manufacturing Industries, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1914 # 10 Y:2019 | 10 | 2019 | OPTIMIZE PLANT POWER FACTOR | $14,446 | $12,425 | n/a |
UK1914 # 09 Y:2019 | 09 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,556 | $21,155 | n/a |
UK1914 # 08 Y:2019 | 08 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $145 | $80 | n/a |
UK1914 # 07 Y:2019 | 07 | 2019 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $150 | $0 | n/a |
UK1914 # 06 Y:2019 | 06 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,746 | $1,370 | n/a |
UK1914 # 05 Y:2019 | 05 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,187 | $0 | n/a |
UK1914 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,233 | $8,100 | n/a |
UK1914 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $394 | $0 | n/a |
UK1914 # 02 Y:2019 | 02 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,217 | $1,100 | n/a |
UK1914 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $642 | $2,510 | n/a |
LE0481 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,696 | $14,000 | Not Implemented |
LE0481 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,057 | $40 | Implemented |
LE0481 # 03 Y:2019 | 03 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $42,460 | $57,500 | Not Implemented |
LE0481 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,547 | $11,688 | Implemented |
LE0481 # 05 Y:2019 | 05 | 2019 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $50,429 | $162,000 | Implemented |
LE0481 # 09 Y:2019 | 09 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $390 | $1,850 | Implemented |
LE0481 # 08 Y:2019 | 08 | 2019 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $2,376 | $10,000 | Not Implemented |
LE0481 # 07 Y:2019 | 07 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $13,688 | $55,000 | Implemented |
LE0481 # 06 Y:2019 | 06 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $842 | $3,200 | Not Implemented |
SD0587 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $15,684 | $52,500 | Implemented |
SD0587 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,956 | $5,187 | Not Implemented |
SD0587 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,075 | $0 | Implemented |
SD0587 # 04 Y:2019 | 04 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $631 | $522 | Not Implemented |
MZ0271 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,858 | $5,781 | Not Implemented |
MZ0271 # 03 Y:2019 | 03 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $586 | $360 | Not Implemented |