IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

70

matching recommendations
Reset
SIC 47 Transportation Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0580 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $10,501 Implemented
UF0580 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $383,709 $1,629,000 Not Implemented
UF0580 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $44,200 $57,498 Implemented
UF0580 # 03 Y:2022 03 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $18,832 $31,696 Implemented
UF0580 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $3,037 $2,270 Implemented
UF0580 # 04 Y:2022 04 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,115 $20,214 Implemented
UF0580 # 05 Y:2022 05 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $8,686 $42,931 Not Implemented
UF0580 # 09 Y:2022 09 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,516 $594 Implemented
UF0580 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,465 $8,588 Implemented
DL0205 # 01 Y:2022 01 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $820 $0 Not Implemented
DL0205 # 09 Y:2022 09 2022 UTILIZE A LESS EXPENSIVE COOLING METHOD $21,960 $20,995 Not Implemented
DL0205 # 08 Y:2022 08 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,193 $3,716 Not Implemented
DL0205 # 07 Y:2022 07 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,276 $64 Not Implemented
DL0205 # 06 Y:2022 06 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,057 $0 Not Implemented
DL0205 # 05 Y:2022 05 2022 ELIMINATE/REDUCE AN OPERATION $2,351 $0 Not Implemented
DL0205 # 04 Y:2022 04 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $15,368 $0 Implemented
DL0205 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $1,040 $0 Not Implemented
DL0205 # 02 Y:2022 02 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,896 $0 Not Implemented
DL0204 # 07 Y:2022 07 2022 ADJUST VENTS TO MINIMIZE ENERGY USE $836 $465 Implemented
DL0204 # 06 Y:2022 06 2022 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $8,754 $18,145 Not Implemented
DL0204 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,599 $24,771 Not Implemented
DL0204 # 04 Y:2022 04 2022 DEVELOP A REPAIR/REPLACE POLICY $32,583 $1,300 Not Implemented
DL0204 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $491 $45 Implemented
DL0204 # 02 Y:2022 02 2022 USE OPTIMUM TEMPERATURE $1,182 $0 Implemented
DL0204 # 01 Y:2022 01 2022 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $18,234 $0 Not Implemented