IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,323

matching recommendations
Reset
SIC 49 Electric, Gas, And Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0089 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,789 $11,754 Implemented
IP0089 # 08 Y:2017 08 2017 USE EXISTING DAM TO GENERATE ELECTRICITY $1,432 $3,507 Not Implemented
IP0089 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60 $264 Not Implemented
IP0089 # 10 Y:2017 10 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,079 $5,047 Implemented
UD0974 # 01 Y:2017 01 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $31,690 $0 Not Implemented
UD0974 # 02 Y:2017 02 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,184 $0 Not Implemented
UD0974 # 03 Y:2017 03 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,021 $0 Not Implemented
UD0974 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,968 $7,125 Not Implemented
WV0552 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $108,472 $401,920 Not Implemented
WV0552 # 02 Y:2017 02 2017 USE POWER DURING OFF-PEAK PERIODS $17,322 $2,500 Implemented
WV0552 # 03 Y:2017 03 2017 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $14,015 $46,500 Not Implemented
WV0552 # 04 Y:2017 04 2017 DEVELOP A REPAIR/REPLACE POLICY $13,726 $620 Not Implemented
WV0552 # 05 Y:2017 05 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $9,424 $1,000 Implemented
WV0552 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,201 $10,486 Implemented
WV0552 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,913 $3,240 Implemented
MZ0232 # 01 Y:2017 01 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,500 $25,000 Not Implemented
MZ0232 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,573 $6,000 Not Implemented
MZ0232 # 03 Y:2017 03 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,891 $10,000 Implemented
UF0511 # 01 Y:2017 01 2017 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $5,783,172 $13,354,800 Not Implemented
UF0511 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $200,909 $20,000 Not Implemented
UF0511 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,022 $14,000 Not Implemented
UF0511 # 04 Y:2017 04 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,447 $20,214 Implemented
UF0511 # 05 Y:2017 05 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,152 $2,800 Not Implemented
UF0511 # 06 Y:2017 06 2017 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $495,807 $1,875,550 Implemented
WM0109 # 01 Y:2017 01 2017 RECOVER AND REUSE WASTE MATERIAL $282,127 $836,828 Not Implemented