IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,323

matching recommendations
Reset
SIC 49 Electric, Gas, And Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1097 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,461 $2,074 Not Implemented
OK1097 # 03 Y:2023 03 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $310 $291 Implemented
OK1097 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $19,348 $189,810 Not Implemented
NL0083 # 01 Y:2023 01 2023 METER WASTE WATER $31,255 $151,280 Implemented
NL0083 # 02 Y:2023 02 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $18,134 $8,660 Implemented
NL0083 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,038 $4,600 Not Implemented
NL0083 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,182 $4,945 Implemented
NL0083 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $854 $2,700 Implemented
NL0083 # 06 Y:2023 06 2023 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $800 $1,548 Not Implemented
NL0083 # 07 Y:2023 07 2023 IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION $200 $2,040 Implemented
MA0863 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $61,906 $581,126 n/a
MA0863 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,184 $71,775 n/a
MA0863 # 03 Y:2023 03 2023 USE HEAT PUMP FOR SPACE CONDITIONING $11,988 $30,000 n/a
MA0863 # 04 Y:2023 04 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,662 $500 n/a
MA0863 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $7,472 $38,800 n/a
MA0863 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $697 $125 n/a
MA0862 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,262 $30,900 n/a
MA0862 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,114 $20,600 n/a
MA0862 # 03 Y:2023 03 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $24,241 $55,000 n/a
MA0862 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $11,416 $78,169 n/a
MA0862 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $4,461 $14,400 n/a
MA0862 # 06 Y:2023 06 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,059 $800 n/a
MA0862 # 07 Y:2023 07 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,570 $2,160 n/a
MA0861 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $98,833 $861,320 n/a
MA0861 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,846 $17,375 n/a