Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
235
matching recommendationsSIC | 49 | Electric, Gas, And Sanitary Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0032 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $869 | $0 | n/a |
SJ0032 # 04 Y:2025 | 04 | 2025 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $5,400 | $34,907 | n/a |
SJ0032 # 06 Y:2025 | 06 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $123 | $0 | n/a |
SJ0032 # 01 Y:2025 | 01 | 2025 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $129,492 | $206,023 | n/a |
SJ0032 # 02 Y:2025 | 02 | 2025 | INSULATE BARE EQUIPMENT | $400 | $297 | n/a |
SJ0032 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,156 | $2,349 | n/a |
SF0620 # 07 Y:2024 | 07 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $511,502 | $6,765,825 | n/a |
SF0620 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,113 | $24,553 | n/a |
SF0620 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $101,612 | $3,840 | n/a |
SF0620 # 05 Y:2024 | 05 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $83,597 | $429,096 | n/a |
SF0620 # 04 Y:2024 | 04 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $11,663 | $52,983 | n/a |
SF0620 # 06 Y:2024 | 06 | 2024 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,786,404 | $4,187,700 | n/a |
SF0620 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $81,460 | $95,723 | n/a |
SF0618 # 10 Y:2024 | 10 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $875 | $3,607 | Implemented |
SF0618 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,266 | $3,170 | Implemented |
SF0618 # 08 Y:2024 | 08 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $22,115 | $60,335 | Not Implemented |
SF0618 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,359 | $2,340 | Implemented |
SF0618 # 07 Y:2024 | 07 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,674 | $19,158 | Not Implemented |
SF0618 # 06 Y:2024 | 06 | 2024 | REDESIGN PROCESS | $59,966 | $75,700 | Not Implemented |
SF0618 # 03 Y:2024 | 03 | 2024 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $705,605 | $250,000 | Implemented |
SF0618 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,735 | $1,500 | Not Implemented |
SF0618 # 09 Y:2024 | 09 | 2024 | USE PHOTOCELL CONTROLS | $2,561 | $10,136 | Not Implemented |
SF0618 # 01 Y:2024 | 01 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,570 | $175 | Implemented |
SF0602 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,247 | $30,019 | Implemented |
SF0602 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,138 | $2,126 | Not Implemented |