IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

556

matching recommendations
Reset
SIC 494 Water Supply
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0077 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50 $37 Implemented
IP0077 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $252 $190 Not Implemented
IP0077 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,269 $3,424 Implemented
IP0077 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $1,389 $1,583 Not Implemented
IP0077 # 07 Y:2017 07 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,360 $2,970 Implemented
IP0077 # 08 Y:2017 08 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,841 $51,853 Not Implemented
MA0763 # 01 Y:2016 01 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,953 $37,590 Implemented
MA0763 # 02 Y:2016 02 2016 USE EXISTING DAM TO GENERATE ELECTRICITY $14,909 $68,625 Not Implemented
MA0763 # 03 Y:2016 03 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,665 $4,950 Not Implemented
MA0763 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,321 $5,078 Implemented
MA0763 # 05 Y:2016 05 2016 PAY UTILITY BILLS ON TIME $2,873 $500 Implemented
MA0763 # 06 Y:2016 06 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,753 $1,000 Implemented
MA0763 # 07 Y:2016 07 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $940 $3,880 Not Implemented
IA0561 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,131 $19,250 Implemented
IA0561 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $1,633 $944 Implemented
IA0561 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,312 $560 Implemented
IA0561 # 04 Y:2016 04 2016 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $533 $195 Implemented
IA0561 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $504 $70 Not Implemented
IA0561 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,225 $5,350 Implemented
MA0758 # 01 Y:2016 01 2016 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,549 $2,836 Implemented
MA0758 # 02 Y:2016 02 2016 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $2,464 $500 Implemented
MA0758 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $2,272 $1,450 Implemented
MA0758 # 04 Y:2016 04 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $917 $960 Implemented
MA0758 # 05 Y:2016 05 2016 REDUCE VENTILATION AIR $754 $3,000 Not Implemented
MA0758 # 06 Y:2016 06 2016 PAY UTILITY BILLS ON TIME $672 $500 Implemented