Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 4941 | Water Supply |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0568 # 05 Y:2018 | 05 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $73,200 | $3,000 | Not Implemented |
WV0568 # 04 Y:2018 | 04 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $1,251 | $562 | Implemented |
WV0568 # 03 Y:2018 | 03 | 2018 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $3,286 | $3,400 | Implemented |
WV0568 # 02 Y:2018 | 02 | 2018 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $9,840 | $2,800 | Implemented |
WV0568 # 01 Y:2018 | 01 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,605 | $52,080 | Not Implemented |
IP0103 # 08 Y:2018 | 08 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $660 | $2,876 | Implemented |
IP0103 # 07 Y:2018 | 07 | 2018 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $9,339 | $29,295 | Not Implemented |
IP0103 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,488 | $32,763 | Implemented |
IP0103 # 05 Y:2018 | 05 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $738 | $1,819 | Not Implemented |
IP0103 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $220 | $186 | Implemented |
IP0103 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $524 | $110 | Implemented |
IP0103 # 01 Y:2018 | 01 | 2018 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,413 | $0 | Not Implemented |
IP0103 # 04 Y:2018 | 04 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,414 | $5,213 | Not Implemented |
GT0914 # 02 Y:2018 | 02 | 2018 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $18,164 | $400 | Implemented |
GT0914 # 03 Y:2018 | 03 | 2018 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $11,239 | $400 | Not Implemented |
GT0914 # 04 Y:2018 | 04 | 2018 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $8,805 | $400 | Not Implemented |
GT0914 # 05 Y:2018 | 05 | 2018 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,028 | $800 | Not Implemented |
GT0914 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,676 | $26,357 | Implemented |
GT0914 # 01 Y:2018 | 01 | 2018 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $56,321 | $400 | Not Implemented |
WV0558 # 05 Y:2018 | 05 | 2018 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $1,726 | $7,488 | Implemented |
WV0558 # 06 Y:2018 | 06 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $629 | $579 | Implemented |
WV0558 # 07 Y:2018 | 07 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $406 | $2,005 | Not Implemented |
WV0558 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $277 | $522 | Implemented |
WV0558 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $2,061 | $1,265 | Not Implemented |
WV0558 # 03 Y:2018 | 03 | 2018 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,223 | $1,000 | Implemented |