Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
834
matching recommendationsSIC | 495 | Sanitary Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0358 # 05 Y:2019 | 05 | 2019 | MINIMIZE WATER USAGE | $77,140 | $207,600 | Implemented |
MI0358 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,962 | $18,807 | Implemented |
MI0358 # 07 Y:2019 | 07 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,254 | $480 | Implemented |
UF0533 # 01 Y:2019 | 01 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $53,828 | $109,400 | Implemented |
UF0533 # 02 Y:2019 | 02 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $42,877 | $213,770 | Implemented |
UF0533 # 03 Y:2019 | 03 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $20,145 | $54,910 | Implemented |
UF0533 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,617 | $472 | Implemented |
UF0533 # 05 Y:2019 | 05 | 2019 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $1,160 | $4,000 | Implemented |
UF0533 # 06 Y:2019 | 06 | 2019 | RECOVER AND REUSE WASTE MATERIAL | $396,790 | $810,000 | Implemented |
CL1913 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,521 | $22,682 | Implemented |
CL1913 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,987 | $32,413 | Implemented |
UU0153 # 02 Y:2019 | 02 | 2019 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $14,902 | $205,000 | Implemented |
UU0153 # 05 Y:2019 | 05 | 2019 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $2,777 | $6,500 | Implemented |
UU0153 # 06 Y:2019 | 06 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $899 | $2,019 | Implemented |
UU0153 # 07 Y:2019 | 07 | 2019 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,444 | $400 | Implemented |
SF0537 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,708 | $260 | Implemented |
SF0537 # 04 Y:2019 | 04 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,414 | $648 | Implemented |
SF0537 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,025 | $5,039 | Implemented |
SF0537 # 07 Y:2019 | 07 | 2019 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $2,238 | $3,000 | Implemented |
SF0537 # 08 Y:2019 | 08 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $77,542 | $235,055 | Implemented |
TR0013 # 01 Y:2019 | 01 | 2019 | INSTALL OCCUPANCY SENSORS | $1,099 | $216 | Implemented |
TR0013 # 02 Y:2019 | 02 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,439 | $0 | Implemented |
TR0013 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,097 | $7,743 | Implemented |
MA0803 # 01 Y:2019 | 01 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,194 | $11,175 | Implemented |
MA0803 # 02 Y:2019 | 02 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,308 | $1,000 | Implemented |