Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,725
matching recommendationsSIC | 495 | Sanitary Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0062 # 01 Y:2022 | 01 | 2022 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $45,354 | $242,300 | Not Implemented |
NL0062 # 02 Y:2022 | 02 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,581 | $24,336 | Implemented |
NL0062 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,498 | $18,517 | Implemented |
NL0062 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,413 | $660 | Implemented |
NL0062 # 05 Y:2022 | 05 | 2022 | RECOVER AND REUSE WASTE MATERIAL | $1,313 | $440 | Not Implemented |
NL0062 # 06 Y:2022 | 06 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,261 | $918 | Not Implemented |
NL0062 # 07 Y:2022 | 07 | 2022 | AIR CONDITION ONLY SPACE NECESSARY | $424 | $50,000 | Implemented |
AM0836 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $12,100 | $11,315 | Implemented |
AM0836 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PLANT POWER FACTOR | $6,240 | $8,070 | Implemented |
AM0836 # 03 Y:2022 | 03 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,850 | $890 | Implemented |
AM0836 # 04 Y:2022 | 04 | 2022 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $1,270 | $2,420 | Implemented |
AM0836 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $570 | $1,820 | Implemented |
AM0836 # 06 Y:2022 | 06 | 2022 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $167 | $35 | Implemented |
AM0831 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $10,140 | $16,600 | Implemented |
AM0831 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $318 | $1,243 | Implemented |
AM0831 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $29 | $111 | Implemented |
OK1058 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $1,800 | $3,000 | Not Implemented |
OK1058 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $455 | $2,130 | Not Implemented |
OK1058 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,252 | $7,778 | Implemented |
OK1058 # 04 Y:2021 | 04 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $185 | $700 | Implemented |
SF0576 # 01 Y:2021 | 01 | 2021 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $15,824 | $0 | Not Implemented |
SF0576 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,886 | $120 | Implemented |
SF0576 # 03 Y:2021 | 03 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,092 | $14,612 | Implemented |
SF0576 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,261 | $17,288 | Implemented |
SF0576 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,882 | $28,653 | Implemented |