Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
199
matching recommendationsSIC | 495 | Sanitary Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0032 # 04 Y:2025 | 04 | 2025 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $5,400 | $34,907 | n/a |
SJ0032 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,156 | $2,349 | n/a |
SJ0032 # 02 Y:2025 | 02 | 2025 | INSULATE BARE EQUIPMENT | $400 | $297 | n/a |
SJ0032 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $869 | $0 | n/a |
SJ0032 # 01 Y:2025 | 01 | 2025 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $129,492 | $206,023 | n/a |
SJ0032 # 06 Y:2025 | 06 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $123 | $0 | n/a |
SF0620 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $101,612 | $3,840 | n/a |
SF0620 # 07 Y:2024 | 07 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $511,502 | $6,765,825 | n/a |
SF0620 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,113 | $24,553 | n/a |
SF0620 # 06 Y:2024 | 06 | 2024 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,786,404 | $4,187,700 | n/a |
SF0620 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $81,460 | $95,723 | n/a |
SF0620 # 05 Y:2024 | 05 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $83,597 | $429,096 | n/a |
SF0620 # 04 Y:2024 | 04 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $11,663 | $52,983 | n/a |
SF0618 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,266 | $3,170 | Implemented |
SF0618 # 10 Y:2024 | 10 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $875 | $3,607 | Implemented |
SF0618 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,735 | $1,500 | Not Implemented |
SF0618 # 08 Y:2024 | 08 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $22,115 | $60,335 | Not Implemented |
SF0618 # 09 Y:2024 | 09 | 2024 | USE PHOTOCELL CONTROLS | $2,561 | $10,136 | Not Implemented |
SF0618 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,359 | $2,340 | Implemented |
SF0618 # 03 Y:2024 | 03 | 2024 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $705,605 | $250,000 | Implemented |
SF0618 # 07 Y:2024 | 07 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,674 | $19,158 | Not Implemented |
SF0618 # 06 Y:2024 | 06 | 2024 | REDESIGN PROCESS | $59,966 | $75,700 | Not Implemented |
SF0618 # 01 Y:2024 | 01 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,570 | $175 | Implemented |
SF0602 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,138 | $2,126 | Not Implemented |
SF0602 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $632 | $0 | Not Implemented |