Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsSIC | 495 | Sanitary Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0083 # 07 Y:2023 | 07 | 2023 | IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION | $200 | $2,040 | Implemented |
NL0083 # 06 Y:2023 | 06 | 2023 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $800 | $1,548 | Not Implemented |
NL0083 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $854 | $2,700 | Implemented |
NL0083 # 02 Y:2023 | 02 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $18,134 | $8,660 | Implemented |
NL0083 # 04 Y:2023 | 04 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,182 | $4,945 | Implemented |
NL0083 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,038 | $4,600 | Not Implemented |
NL0083 # 01 Y:2023 | 01 | 2023 | METER WASTE WATER | $31,255 | $151,280 | Implemented |
NL0068 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,258 | $7,000 | Implemented |
NL0068 # 02 Y:2022 | 02 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $20,357 | $960 | Implemented |
NL0068 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $17,011 | $25,884 | Implemented |
NL0068 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,339 | $4,500 | Implemented |
NL0068 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,608 | $5,394 | Implemented |
NL0050 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,749 | $5,975 | Implemented |
NL0050 # 03 Y:2020 | 03 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $328 | $2,465 | Implemented |
NL0050 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $58 | $280 | Implemented |
NL0050 # 04 Y:2020 | 04 | 2020 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $117 | $388 | Implemented |
NL0050 # 01 Y:2020 | 01 | 2020 | USE AUTOMATIC CLEANING EQUIPMENT | $4,536 | $22,386 | Implemented |
NL0043 # 07 Y:2020 | 07 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $920 | $70 | Not Implemented |
NL0043 # 08 Y:2020 | 08 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $719 | $135 | Implemented |
NL0043 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,480 | $37,056 | Not Implemented |
NL0043 # 02 Y:2020 | 02 | 2020 | KEEP EQUIPMENT CLEAN | $10,419 | $41,591 | Not Implemented |
NL0043 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,824 | $25,408 | Not Implemented |
NL0043 # 04 Y:2020 | 04 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,551 | $70 | Implemented |
NL0043 # 05 Y:2020 | 05 | 2020 | USE RADIANT HEATER FOR SPOT HEATING | $1,657 | $2,700 | Not Implemented |
NL0043 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,010 | $1,108 | Implemented |