IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

187

matching recommendations
Reset
SIC 495 Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0036 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $678 $755 Implemented
TR0036 # 02 Y:2022 02 2022 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $3,510 $40,423 Not Implemented
TR0036 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $105,888 $1,890,673 Not Implemented
UC2206 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,119 $33,560 Not Implemented
UC2206 # 07 Y:2022 07 2022 USE BATTERY STORAGE FOR DEMAND CONTROL $27,967 $231,837 Not Implemented
UC2206 # 01 Y:2022 01 2022 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $31,115 $0 Not Implemented
UC2206 # 05 Y:2022 05 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,660 $16,842 Not Implemented
UC2206 # 06 Y:2022 06 2022 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $1,713 $3,300 Not Implemented
UC2206 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $57,154 $500 Not Implemented
UC2206 # 02 Y:2022 02 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,557 $1,500 Not Implemented
UC2205 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,071 $2,641 Not Implemented
UC2205 # 06 Y:2022 06 2022 USE BATTERY STORAGE FOR DEMAND CONTROL $65,817 $383,577 Not Implemented
UC2205 # 02 Y:2022 02 2022 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $19,018 $0 Not Implemented
UC2205 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $279,536 $1,875,313 Not Implemented
UC2205 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,990 $500 Not Implemented
UC2205 # 04 Y:2022 04 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,840 $500 Not Implemented
MS0407 # 01 Y:2022 01 2022 USE OPTIMUM THICKNESS INSULATION $276 $1,511 n/a
MS0407 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $35,678 $304,500 n/a
MS0407 # 03 Y:2022 03 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $293 $1,944 n/a
WV0634 # 01 Y:2022 01 2022 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $45,174 $141,500 Not Implemented
WV0634 # 02 Y:2022 02 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,909 $43,000 Not Implemented
WV0634 # 04 Y:2022 04 2022 DEVELOP A REPAIR/REPLACE POLICY $1,166 $1,633 Implemented
WV0634 # 05 Y:2022 05 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $973 $1,500 Implemented
WV0634 # 06 Y:2022 06 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $214 $908 Implemented
WV0634 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $8,882 $8,985 Implemented