Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,546
matching recommendationsSIC | 4952 | Sewerage Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0299 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $554 | $642 | n/a |
IC0299 # 08 Y:2024 | 08 | 2024 | INSULATE BARE EQUIPMENT | $1,981 | $847 | n/a |
IC0299 # 09 Y:2024 | 09 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $56,790 | $31,894 | n/a |
IC0299 # 01 Y:2024 | 01 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,372 | $2,712 | n/a |
IC0299 # 06 Y:2024 | 06 | 2024 | BURN A LESS EXPENSIVE GRADE OF FUEL | $447,899 | $23,503 | n/a |
UF0607 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $36,207 | $25,350 | n/a |
UF0607 # 06 Y:2023 | 06 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $183,418 | $60,000 | n/a |
UF0607 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,683 | $0 | n/a |
UF0607 # 02 Y:2023 | 02 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $122,669 | $11,700 | n/a |
UF0607 # 01 Y:2023 | 01 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $173,293 | $118,890 | n/a |
UF0607 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $94,496 | $322,608 | n/a |
UD1074 # 02 Y:2024 | 02 | 2024 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $12,621 | $12,700 | n/a |
UD1074 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $32,977 | $336,971 | n/a |
UD1074 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $24,521 | $207,175 | n/a |
UD1074 # 01 Y:2024 | 01 | 2024 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $9,834 | $0 | n/a |
UD1074 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,018 | $8,430 | n/a |
UF0606 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $35,430 | $25,350 | n/a |
UF0606 # 01 Y:2023 | 01 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $188,564 | $146,067 | n/a |
UF0606 # 06 Y:2023 | 06 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $214,485 | $60,000 | n/a |
UF0606 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,283 | $0 | n/a |
UF0606 # 03 Y:2023 | 03 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $38,799 | $79,800 | n/a |
UF0606 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $65,322 | $322,608 | n/a |
OR0784 # 01 Y:2023 | 01 | 2023 | USE OTHER WASTE CONCENTRATION METHODS | $61,484 | $125,000 | n/a |
OR0784 # 02 Y:2023 | 02 | 2023 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $343,134 | $700,000 | n/a |
OR0784 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $4,041 | $12,113 | n/a |