IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

151

matching recommendations
Reset
SIC 4952 Sewerage Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0108 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $778 $548 Not Implemented
WM0106 # 01 Y:2017 01 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $68,853 $480,000 Not Implemented
WM0106 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,721 $49,500 Not Implemented
WM0106 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,613 $11,130 Not Implemented
WM0106 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,352 $3,278 Implemented
WM0106 # 05 Y:2017 05 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,204 $0 Implemented
WM0106 # 06 Y:2017 06 2017 USE SYNTHETIC LUBRICANT $1,915 $11,475 Not Implemented
WM0106 # 07 Y:2017 07 2017 USE OPTIMUM TEMPERATURE $1,605 $0 Implemented
WM0106 # 08 Y:2017 08 2017 USE RADIANT HEATER FOR SPOT HEATING $2,133 $3,818 Implemented
WM0106 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $1,138 $600 Implemented
WM0106 # 10 Y:2017 10 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $416 $800 Not Implemented
WM0105 # 01 Y:2017 01 2017 USE SYNTHETIC LUBRICANT $25,804 $54,545 Not Implemented
WM0105 # 02 Y:2017 02 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,974 $0 Not Implemented
WM0105 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,606 $45,000 Not Implemented
WM0105 # 04 Y:2017 04 2017 USE POWER DURING OFF-PEAK PERIODS $6,920 $12,100 Not Implemented
WM0105 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,993 $3,400 Implemented
WM0105 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $1,053 $555 Not Implemented
WM0105 # 07 Y:2017 07 2017 USE RADIANT HEATER FOR SPOT HEATING $290 $1,315 Not Implemented
WM0098 # 01 Y:2016 01 2016 USE SYNTHETIC LUBRICANT $31,522 $56 Implemented
WM0098 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,985 $6,397 Implemented
WM0098 # 03 Y:2016 03 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,494 $4,661 Not Implemented
WM0098 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,481 $0 Implemented
WM0098 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,011 $1,000 Not Implemented
WM0098 # 06 Y:2016 06 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,334 $0 Not Implemented
WM0098 # 07 Y:2016 07 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,178 $0 Not Implemented